River Road to Rivergate Drive Connection
This study is now complete.
The City of Winnipeg is preparing a design for a new walking and cycling path that will run along the bank of the Red River from River Road to Rivergate Drive. The pathway would provide a safe and comfortable connection to future pedestrian and cycling infrastructure in the area. Due to riverbank instability in the area, the project would require riverbank stabilization.
- Updates
- Engage
- Timeline
- Background
- Documents
- FAQs
- Maps
Updates
After analysis of the several path alignments, the path alignment concept at the top of the riverbank is considered to be the most desirable for a 4.5 metre off-street pathway between River Road and Rivergate Drive along the Red River. However, as there is no projected funding to construct the pathway and given the uncertainty of when construction would take place, no alignment is being recommended at this time. Should funding become available, the four options should be re-evaluated to ensure any changes to the riverbank and surrounding neighbourhood are taken into consideration.
Engage
Thank you to those who attended meetings and provided feedback through the online comment form. The comment form was open from November 2 to December 17, 2017 and we received 36 responses, where respondents were predominately residents of the area.
Key items discussed through both stakeholder meetings and the online survey included:
- The proximity of the proposed pathway to the adjacent condominium properties;
- The proximity of the proposed pathway to the adjacent single-family dwellings along Rivergate Drive;
- The proposed pathway located on City of Winnipeg property versus private property; and
- Riverbank stabilization.
What we heard | How it was considered |
---|---|
Concerns for disruptive behavior and privacy of landowners adjacent to the path. (3 comments in survey, noted in stakeholder meetings) | Concerns were noted and if the project moved forward for construction, typographic information would confirm if the path could be moved slightly away from the property line. |
Concern regarding environmental impacts of project, including removal of trees was another common theme during in-person meetings. (Noted in stakeholder meetings) | A sub consultant was hired to look at the bank and whether there are stabilization issues. In order to construct the path, stabilization would be required along the bank. The vegetation along the riverbank will likely be affected by the stabilization efforts. The path along Rivergate Drive will be on the other (south) side of the trees, so they will not be removed. |
If you would like to stay updated on City of Winnipeg public engagement events, follow the City on Facebook and Twitter or sign up for the City of Winnipeg public engagement newsletter.
Background
Each year, a Pedestrian and Cycling Action Plan is developed outlining the Public Service’s annual recommendations for spending the yearly capital budget associated with walking and cycling. On May 18, 2016, City Council approved the 2016 Pedestrian and Cycling Action Plan authorizing the Public Service to proceed with this project.
Documents
Document Name | Date | Type |
---|---|---|
Detailed Drawing | 2017-11-30 | Materials |