Last Update: June 30, 2025 04:32 p.m.
Iowa St to Wyoming St
Expected Duration: 24 Jun 2025 - 11 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Andrews St to Powers St
Expected Duration: 05 Jul 2023 - 02 Jul 2025
North side sidewalk, closed for building construction/maintenance.
Dakota St to River Rd
Expected Duration: 02 Jul 2025 - 24 Oct 2025
Westbound curb lane, westbound middle lane, eastbound curb lane, closed for street construction/maintenance.
Fort Garry Bridge to Pembina Hw SB to Abinojii Mikanah WB
Expected Duration: 27 Jun 2025 - 26 Sep 2025
Westbound curb lane, westbound median lane, closed for street construction/maintenance.
Lakewood Bv to Island Shore Bv
Expected Duration: 03 Jul 2025 - 16 Jul 2025
Eastbound right turn (yield) lane to Southbound Island Shore Blvd, closed for street construction/maintenance. Eastbound right turn (yield) lane will be open for morning and afternoon rush hours.
Newmarket Bv to Pembina Hw SB to Abinojii Mikanah EB
Expected Duration: 27 May 2025 - 30 Sep 2025
Eastbound curb lane, eastbound median lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Eastbound median lane will be open for morning and afternoon rush hours.
St Annes Rd to River Rd
Expected Duration: 20 May 2025 - 27 Jun 2025
Eastbound curb lane, westbound median lane, closed for landscaping/tree maintenance. Eastbound curb lane will be open for afternoon rush hour. Westbound median lane will be open for morning and afternoon rush hours.
Guelph St to Harrow St
Expected Duration: 02 Jul 2025 - 09 Jul 2025
Eastbound median lane, westbound median lane, north side sidewalk, closed for sewer work. Eastbound median lane will be open for morning and afternoon rush hours. Westbound median lane will be open for morning and afternoon rush hours.
Boyd Av to Aberdeen Av
Expected Duration: 02 Jul 2025 - 18 Jul 2025
Hartford Av to Perth Av
Expected Duration: 28 Jun 2025 - 03 Jul 2025
Southbound curb lane, closed for film production or special event/festival.
Inkster Bv to Lansdowne Av
Expected Duration: 12 May 2025 - 15 Aug 2025
All lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. At least one sidewalk to remain open at all times.
Inkster Bv to Lansdowne Av
Expected Duration: 20 May 2025 - 15 Aug 2025
All southbound lanes, all northbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 18 Mar 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Notre Dame Av to McDermot Av
Expected Duration: 01 Apr 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Ada St to Dee St
Expected Duration: 16 Jun 2025 - 16 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Dorothy St to Tecumseh St
Expected Duration: 26 Jun 2025 - 25 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Lily St to Martha St
Expected Duration: 19 Jun 2025 - 04 Jul 2025
South side sidewalk, closed for building construction/maintenance.
Lily St to Waterfront Dr
Expected Duration: 23 Mar 2025 - 31 Oct 2025
Patio installed on the Eastbound curb lane and south sidewalk; pedestrian access remains open.
Nora St to Beacon St
Expected Duration: 27 Jun 2025 - 11 Jul 2025
All westbound lanes, closed for water work.
Trinity St to Dorothy St
Expected Duration: 27 Jun 2025 - 11 Jul 2025
All eastbound lanes, closed for water work.
Xante St to Trinity St
Expected Duration: 17 Jun 2025 - 29 Aug 2025
All eastbound lanes, south side sidewalk, closed for water work. Only westbound traffic permitted.
Nairn Av to Tweed Av
Expected Duration: 01 Jul 2025 - 08 Aug 2025
All northbound lanes, east side sidewalk, closed for street construction/maintenance.
Tweed Av to Thames Av
Expected Duration: 01 Jul 2025 - 08 Aug 2025
All northbound lanes, east side sidewalk, closed for street construction/maintenance.
Gagnon St to Buchanan Bv
Expected Duration: 02 Jun 2025 - 18 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
At Chancellor Dr
Expected Duration: 09 Jun 2025 - 05 Sep 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Amber Tl to Pipeline Rd
Expected Duration: 23 May 2025 - 30 Jun 2025
Local access lanes and north side sidewalk, closed for street construction/maintenance.
Jarvis Av to Flora Av
Expected Duration: 16 Jun 2025 - 28 Jul 2025
Southbound curb lane, closed for water work. Back lane access on Andrews St servicing Dufferin and Stella closed. Please access the back lane from Powers St.
Lansdowne Av to Inkster Bv
Expected Duration: 12 May 2025 - 15 Aug 2025
All lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. At least one sidewalk to remain open at all times.
Royal Av to Hartford Av
Expected Duration: 06 Jan 2025 - 04 Jul 2025
Southbound curb lane, closed for sewer work.
Logan Av to Dufferin Av
Expected Duration: 21 Nov 2023 - 01 Jan 2099
The bridge is closed indefinitely. End date is not applicable but is a requirement of the lane closure system.
Inkster Bv to Lansdowne Av
Expected Duration: 14 May 2025 - 15 Aug 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Pacific Av to Logan Av
Expected Duration: 27 Jun 2025 - 11 Jul 2025
Northbound curb lane, east side sidewalk, closed for water work.
St Matthews Av to Ellice Av
Expected Duration: 27 May 2025 - 27 Jun 2025
All northbound lanes, closed for electrical/lighting/signals work.
Scotia St to Marymound Wy
Expected Duration: 16 Jun 2025 - 08 Aug 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Osborne St to Hay St
Expected Duration: 02 Dec 2024 - 20 Feb 2026
Eastbound curb lane, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Manitoba Av to Selkirk Av
Expected Duration: 10 Jun 2025 - 14 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
McDermot Av to Bannatyne Av
Expected Duration: 21 Mar 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Ellice Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Highfield St to Lyndale Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, west side sidewalk, east side sidewalk, closed for street construction/maintenance.
Cavalier Dr to Lumsden Av
Expected Duration: 09 Oct 2024 - 22 Nov 2024
Southbound curb lane, closed for loading/unloading. Southbound curb lane will be open for morning and afternoon rush hours.
Navy Wy to Garry St
Expected Duration: 14 Mar 2025 - 31 Oct 2025
Patio installed on the south sidewalk; pedestrian access remains open.
Riveroaks Dr to Parkview St
Expected Duration: 02 Jun 2025 - 28 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Pavilion Cr to Zoo Dr
Expected Duration: 14 Jul 2025 - 22 Jul 2025
Westbound curb lane, closed for film production or special event/festival.
Aikins St to Salter St
Expected Duration: 16 Jun 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Canberra Rd to Cottonwood Rd
Expected Duration: 25 Jun 2025 - 21 Jul 2025
Northbound right turn (yield) lane, closed for communications work.
Cottonwood Rd to Betournay St
Expected Duration: 02 Jun 2025 - 04 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
At Point West Dr
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 18 Jun 2025 - 18 Jul 2025
Northbound median lane, west side sidewalk, closed for building construction/maintenance.
Portage Av to Ellice Av
Expected Duration: 30 Jun 2025 - 21 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Notre Dame Av to St James St
Expected Duration: 23 Jun 2025 - 15 Aug 2025
All eastbound lanes, closed for street construction/maintenance.
Adelaide St to Princess St
Expected Duration: 12 Dec 2024 - 15 Jan 2026
Westbound median lane, closed for loading/unloading.
King St to Adelaide St
Expected Duration: 12 Jul 2025 - 12 Jul 2025
All westbound lanes, north side sidewalk, closed for film production or special event/festival.
King St to Albert St
Expected Duration: 30 Jun 2025 - 11 Jul 2025
All westbound lanes, south side sidewalk, closed for street construction/maintenance. Only one lane closed starting Monday, June 30. Full closure to begin July 2. Bike lane to remain open at all times.
Rorie St to Main St
Expected Duration: 18 Mar 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Rorie St to Waterfront Dr
Expected Duration: 22 Apr 2025 - 31 Aug 2025
Back lane/public lane, south side sidewalk, closed for building construction/maintenance.
Waterfront Dr to Rorie St
Expected Duration: 06 Sep 2022 - 30 Jun 2025
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Waterfront Dr to Rorie St
Expected Duration: 06 Jun 2025 - 06 Jun 2025
All westbound lanes, westbound painted bike lane, closed for building construction/maintenance. All westbound lanes will be open for morning and afternoon rush hours.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Einarson Av to Portage Av
Expected Duration: 20 Jun 2025 - 14 Jul 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Einarson Av to Portage Av
Expected Duration: 02 Jul 2025 - 15 Jul 2025
East side sidewalk, west side sidewalk, closed for sewer work. Only one sidewalk closed at a time.
Prince Edward St to Rover Av
Expected Duration: 10 Jun 2025 - 07 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Pulberry St to St Marys Rd
Expected Duration: 20 May 2025 - 18 Jul 2025
All eastbound lanes, south side sidewalk, closed for street construction/maintenance.
Allegheny Dr to End
Expected Duration: 12 Jun 2025 - 11 Jul 2025
All eastbound lanes, closed for water work.
Alexander Av to Logan Av
Expected Duration: 16 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Mathers Av to Taylor Av
Expected Duration: 30 Jun 2025 - 30 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Taylor Av to Mathers Av
Expected Duration: 10 Jun 2025 - 11 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
At Beechtree Cr
Expected Duration: 19 Jun 2025 - 10 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
Beechtree Cr to Trafford Pk
Expected Duration: 19 Jun 2025 - 10 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Powers St to McGregor St
Expected Duration: 02 Apr 2025 - 04 Jul 2025
Westbound curb lane, closed for sewer work.
Daly St S to Hugo St S
Expected Duration: 08 Jul 2025 - 08 Jul 2025
Eastbound curb lane, closed for sewer work. Eastbound curb lane will be open for afternoon rush hour.
Government Av to Prince Rupert Av
Expected Duration: 12 Jun 2025 - 07 Jul 2025
Northbound curb lane, closed for water work.
Allard Av to Portage Av
Expected Duration: 20 Jun 2025 - 25 Jul 2025
Back lane/public lane, closed for sewer work.
Ellice Av to St Matthews Av
Expected Duration: 09 Jun 2025 - 04 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Portage Av to St Matthews Av
Expected Duration: 29 May 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for sewer work.
Sargent Av to Ellice Av
Expected Duration: 19 Jun 2025 - 26 Jun 2025
Southbound curb lane, closed for building construction/maintenance.
Pembina Hw to River Rd
Expected Duration: 05 Feb 2024 - 31 Dec 2025
Eastbound shoulder lane, closed for sewer work.
Centre St to Park East Dr
Expected Duration: 06 Jan 2023 - 29 Aug 2025
South side sidewalk, closed for building construction/maintenance.
East Gate to West Gate
Expected Duration: 02 Jun 2025 - 30 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
Middle Gate to West Gate
Expected Duration: 04 Jun 2025 - 30 Jun 2025
Temporary Accessible Permit Parking Only location installed in the Westbound curb lane to accommodate for nearby road construction.
Pipeline Rd to Maevista Pl
Expected Duration: 09 Jun 2025 - 07 Aug 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Des Meurons St to Egerton Rd
Expected Duration: 02 Jun 2025 - 01 Aug 2025
Westbound curb lane, closed for loading/unloading.
At McDowell Dr
Expected Duration: 02 Jun 2025 - 01 Aug 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Cherrywood Rd to Glen Ivy Ct
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Grant Av to Mathers Av
Expected Duration: 30 May 2025 - 30 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
Broadway to Portage Av
Expected Duration: 09 Jun 2025 - 11 Jul 2025
Southbound curb lane, closed for sewer work.
Pembina Hw to Hudson St
Expected Duration: 27 May 2025 - 08 Aug 2025
Two-Hour Parking Restrictions temporarily lifted to accommodate residents due to street construction/maintenance in the surrounding area.
Arlington St to Parr St
Expected Duration: 04 Jun 2025 - 07 Jul 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
McGregor St to Andrews St
Expected Duration: 17 May 2025 - 16 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Osborne St to Churchill Dr
Expected Duration: 17 Jun 2025 - 08 Jul 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. One lane will remain open at all times for local traffic. Eastbound and westbound curb lanes will be open for morning and afternoon rush hours.
Dubuc St to Yardley St
Expected Duration: 22 May 2025 - 30 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Dubuc St to Yardley St
Expected Duration: 28 Jun 2025 - 28 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Newhaven Av to End
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Colony St to Good St
Expected Duration: 09 Apr 2025 - 06 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Donald St to Hargrave St
Expected Duration: 10 Feb 2025 - 18 Jul 2025
Back lane/public lane, closed for building construction/maintenance.
Edmonton St to Kennedy St
Expected Duration: 07 Jul 2025 - 08 Sep 2025
North side sidewalk, closed for street construction/maintenance.
Main St to Osborne St N
Expected Duration: 16 Jun 2025 - 03 Jul 2025
Eastbound median lane, closed for street construction/maintenance.
St Marys Rd to West Fernwood Av
Expected Duration: 20 May 2025 - 11 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Holden Av to End
Expected Duration: 07 Jul 2025 - 11 Jul 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
River Av to Roslyn Rd
Expected Duration: 16 Jun 2025 - 11 Jul 2025
No access to/from Roslyn Rd.
John Forsyth Rd to Brixton By
Expected Duration: 24 Jun 2025 - 11 Jul 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Einarson Av to Portage Av
Expected Duration: 15 Apr 2025 - 10 Jul 2025
West side sidewalk, closed for street construction/maintenance.
Salter St to Andrews St
Expected Duration: 27 Feb 2025 - 04 Jul 2025
Westbound curb lane, closed for sewer work.
Buckle Dr to Malone St
Expected Duration: 19 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
At Donwood Dr
Expected Duration: 26 May 2025 - 06 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Corydon Av to Fleet Av
Expected Duration: 30 Jun 2025 - 22 Aug 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
Beghin Av to Ray Marius Rd
Expected Duration: 17 Jun 2025 - 21 Jul 2025
Eastbound curb lane, closed for water work.
Ellice Av to Portage Av
Expected Duration: 07 Sep 2024 - 05 Sep 2025
Southbound median lane, east side sidewalk, closed for building construction/maintenance. Southbound median lane will be open for morning and afternoon rush hours.
Ellice Av to Portage Av
Expected Duration: 02 Jul 2025 - 18 Jul 2025
Southbound middle lane 2, closed for street construction/maintenance. Southbound middle lane 2 will be open for morning and afternoon rush hours.
Ellice Av to Portage Av
Expected Duration: 05 Jul 2025 - 05 Jul 2025
All southbound lanes, east side sidewalk, closed for building construction/maintenance. All southbound lanes will be open for morning and afternoon rush hours.
Graham Av to St Mary Av
Expected Duration: 09 Jul 2018 - 01 Sep 2025
Back lane/public lane, west side sidewalk, closed for building construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 18 Mar 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Notre Dame Av to Qu'Appelle Av
Expected Duration: 27 Jun 2025 - 21 Jul 2025
All southbound lanes, southbound painted bike lane, west side sidewalk, closed for street construction/maintenance. Only one southbound lane closed at a time. Southbound curb lane will be open for morning and afternoon rush hours. Southbound median lane will be open for morning and afternoon rush hours.
McKenzie St to Copp St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Guelph St to Wilton St
Expected Duration: 02 Jul 2025 - 25 Jul 2025
Westbound curb lane, closed for sewer work.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Jacob's Creek Rd to Bison Dr
Expected Duration: 28 Feb 2024 - 30 Jun 2025
Northbound curb lane, closed for building construction/maintenance.
Century St to Queen St
Expected Duration: 05 Jul 2025 - 06 Jul 2025
Southbound Century St(Route 90) Exit Ramp to Portage Ave via Queen St closed for street construction/maintenance. Exit ramp to be open for all peak hours.
At Lake Village Rd
Expected Duration: 27 Jun 2025 - 04 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Gaylene Pl to Pembina Hw
Expected Duration: 12 May 2025 - 21 Nov 2025
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, closed for street construction/maintenance.
Markham Rd to Lakeshore Rd
Expected Duration: 09 Jun 2025 - 05 Sep 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Pembina Hw to University Cr
Expected Duration: 09 Jul 2025 - 11 Jul 2025
Road will be open, but permit allows for Bomber team to control ingress & egress. All repurposing plans made in coordination with Public Works Traffic Services.
Pembina Hw to University Cr
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Road will be open, but permit allows for Bomber team to control ingress & egress. All repurposing plans made in coordination with Public Works Traffic Services.
Aberdeen Av to Boyd Av
Expected Duration: 02 Jul 2025 - 18 Jul 2025
Egesz St to Marble Av
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Dakota St to St Marys Rd
Expected Duration: 02 Jul 2025 - 25 Jul 2025
Westbound curb lane, closed for sewer work.
Pembina Hw to Hudson St
Expected Duration: 23 Jun 2025 - 04 Jul 2025
Westbound curb lane, westbound painted bike lane, closed for street construction/maintenance.
Salter St to Powers St
Expected Duration: 24 Jun 2025 - 13 Jul 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
Daly St S to Montgomery Av
Expected Duration: 26 May 2025 - 04 Jul 2025
All eastbound lanes, south side sidewalk, closed for street construction/maintenance.
Kirkdale St to Coniston St
Expected Duration: 02 Jul 2025 - 03 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Irene St to Hamelin St
Expected Duration: 18 Jun 2025 - 29 Aug 2025
Westbound curb lane, closed for loading/unloading.
Clifton Pl to Ellice Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Jessie Av to Corydon Av
Expected Duration: 04 Jul 2025 - 04 Jul 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Barnes St to Shore St
Expected Duration: 24 Jun 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Artillery St to Sinclair St
Expected Duration: 12 Jun 2025 - 11 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Sinclair St to Artillery St
Expected Duration: 05 Jun 2025 - 11 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Silver Av to Ness Av
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Southbound curb lane, west side sidewalk, closed for gas work. Southbound curb lane will be open for morning and afternoon rush hours.
Memorial Bv to St Mary Av
Expected Duration: 11 Nov 2023 - 18 Jul 2025
Complete closure of all southbound lanes, complete closure of all northbound lanes, west side sidewalk, closed for street construction/maintenance.
St Mary Av to Broadway
Expected Duration: 30 Jun 2025 - 21 Jul 2025
Southbound curb lane, east side sidewalk, closed for street construction/maintenance.
Brazier St to Roch St
Expected Duration: 10 Jun 2025 - 07 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Oakland Av to Mark Pearce Av
Expected Duration: 30 May 2025 - 14 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Carpathia Rd to Kenaston Bv
Expected Duration: 16 Jun 2025 - 07 Jul 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Cockburn St N to Arbuthnot St
Expected Duration: 30 Jun 2025 - 31 Oct 2025
Westbound curb lane, closed for film production or special event/festival.
Daly St N to Hugo St N
Expected Duration: 30 Jun 2025 - 31 Oct 2025
Westbound curb lane, closed for film production or special event/festival.
Daly St N to Hugo St N
Expected Duration: 12 Apr 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Edgeland Bv to Tuxedo Av
Expected Duration: 15 Nov 2024 - 30 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Lanark St to Angelo Grande Bocce Wy
Expected Duration: 25 Apr 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Niagara St to Queenston St
Expected Duration: 20 Feb 2025 - 21 Mar 2025
North side sidewalk, closed for building construction/maintenance.
Southport Bv to Tuxedo Av
Expected Duration: 23 Jun 2025 - 30 Jun 2025
Westbound curb lane, closed for sewer work.
Wilton St to Guelph St
Expected Duration: 17 Jan 2025 - 01 Aug 2025
South side sidewalk, closed for building construction/maintenance.
Canberra Rd to Autumnwood Dr
Expected Duration: 30 Jun 2025 - 27 Apr 2026
Westbound right turn (yield) lane, closed for sewer work.
Canberra Rd to Speers Rd
Expected Duration: 25 Jun 2025 - 21 Jul 2025
Eastbound curb lane, westbound curb lane, closed for water work. One lane to remain open at all times.
Lyndale Dr to St Marys Rd
Expected Duration: 20 May 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance.
Carlton St to Hargrave St
Expected Duration: 27 Jun 2025 - 22 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Access Rd to Abinojii Mikanah
Expected Duration: 01 Jul 2025 - 28 Jul 2025
Northbound curb lane, closed for sewer work.
John Forsyth Rd to Aldgate Rd
Expected Duration: 24 Jun 2025 - 14 Jul 2025
Northbound curb lane, southbound curb lane, closed for electrical/lighting/signals work. Only one lane to be closed at a time. All lanes will be open for morning and afternoon rush hours.
John Forsyth Rd to Aldgate Rd
Expected Duration: 16 Jun 2025 - 18 Jul 2025
Southbound curb lane, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
John Forsyth Rd to Warde Av
Expected Duration: 16 Jun 2025 - 18 Jul 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
John Forsyth Rd to Warde Av
Expected Duration: 16 Jun 2025 - 18 Jul 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Paddington Rd to Warde Av
Expected Duration: 16 Jun 2025 - 18 Jul 2025
Southbound curb lane, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Southglen Bv to Hyatt Pl
Expected Duration: 16 Jun 2025 - 18 Jul 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Leeds Av to Nuffield Pl
Expected Duration: 26 Jun 2025 - 18 Jul 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
St Edmunds By to Baylor Av
Expected Duration: 25 Jun 2025 - 07 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. One lane to remain open and controlled via flagpersons.
Ulster St to Silverstone Av
Expected Duration: 26 Jun 2025 - 14 Jul 2025
All lanes and north side sidewalk, closed for electrical/lighting/signals work. Only one lane in each direction to be closed at a time and all lanes will be open for peak hours.
Hethrington Av to Arnold Av
Expected Duration: 07 Jul 2025 - 07 Jul 2025
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for afternoon rush hour.
Pembina Hw to Snow St
Expected Duration: 09 Jul 2025 - 11 Jul 2025
Eastbound curb lane, closed for film production or special event/festival.
Pembina Hw to Snow St
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Eastbound curb lane, closed for film production or special event/festival.
Pembina Hw to Snow St
Expected Duration: 16 Jun 2025 - 22 Aug 2025
Eastbound curb lane, all westbound lanes, closed for street construction/maintenance. One Eastbound lane for hospital access to be maintained at all times. Westbound traffic prohibited.
Ravelston Av W to Pandora Av E
Expected Duration: 12 May 2025 - 31 Jul 2025
Southbound curb lane, southbound median lane, northbound left turn storage lane, west side sidewalk, closed for street construction/maintenance.
Thom Av E to Dowling Av W
Expected Duration: 07 Jun 2025 - 04 Jul 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for water work.
Dugas St to Elizabeth Rd
Expected Duration: 02 Jul 2025 - 08 Aug 2025
Southbound curb lane, closed for building construction/maintenance.
Tache Av to Aulneau St
Expected Duration: 01 Jul 2025 - 01 Jul 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival.
McIvor Av to Bonner Av
Expected Duration: 23 Jun 2025 - 09 Sep 2025
All southbound lanes, closed for street construction/maintenance.
Brazier St to Lacy St
Expected Duration: 12 May 2025 - 01 Aug 2025
All lanes and south side sidewalk, closed for street construction/maintenance. One lane to remain open for local access.
Henderson Hw to McPhail St
Expected Duration: 13 Jun 2025 - 07 Jul 2025
All eastbound lanes, closed for water work.
At Portage Av
Expected Duration: 26 Jun 2025 - 27 Jun 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Hamel Av to Cabana Pl
Expected Duration: 20 Jun 2025 - 14 Jul 2025
Northbound curb lane, southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Horace St to Eugenie St
Expected Duration: 20 Jun 2025 - 21 Jul 2025
Southbound shoulder lane, closed for water work.
Horace St to Marion St
Expected Duration: 20 May 2025 - 01 Sep 2025
Northbound curb lane, closed for street construction/maintenance.
Horace St to Marion St
Expected Duration: 16 Apr 2025 - 16 Jun 2025
East side sidewalk, closed for building construction/maintenance.
Marion St to Goulet St
Expected Duration: 25 Jun 2025 - 04 Jul 2025
Southbound curb lane, northbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. One sidewalk to remain open at all times.
Provencher Bv to De La Cathedrale Av
Expected Duration: 22 May 2025 - 07 Jul 2025
Southbound curb lane, closed for water work.
Provencher Bv to De La Cathedrale Av
Expected Duration: 25 Jun 2025 - 09 Jul 2025
Southbound median lane, northbound median lane, west side sidewalk, closed for street construction/maintenance.
Myles Robinson Wy to Island Lakes Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Brazier St to Roch St
Expected Duration: 23 Jun 2025 - 21 Jul 2025
Eastbound curb lane, south side sidewalk, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Kairistine Ln to Kinver Av
Expected Duration: 20 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Wolever Av to Westminster Av
Expected Duration: 02 Jul 2025 - 18 Jul 2025
Only right-turns permitted from Dominion St onto Portage Ave. West side crosswalk and east side crosswalk closed. Only one crosswalk to be closed at a time.
Ellice Av to Portage Av
Expected Duration: 14 Nov 2024 - 24 Feb 2025
Back lane/public lane, closed for loading/unloading.
St Mary Av to York Av
Expected Duration: 10 Oct 2024 - 01 May 2026
Southbound median lane, south side sidewalk, closed for building construction/maintenance.
St Mary Av to York Av
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Southbound median lane and both southbound middle lanes closed for building construction/maintenance. The Southbound curb lane to remain open at all times for through traffic.
York Av to Broadway
Expected Duration: 10 Jan 2025 - 10 Jan 2025
Southbound median lane, southbound painted bike lane, west side sidewalk, closed for building construction/maintenance. Southbound median lane will be open for morning and afternoon rush hours.
At Portage Av
Expected Duration: 15 Apr 2025 - 15 Apr 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Notre Dame Av to Dublin Av Bridge Over Omands Creek
Expected Duration: 30 Jun 2025 - 01 Aug 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Hugo St N to Arbuthnot St
Expected Duration: 06 Jun 2025 - 27 Jun 2025
Parr St to Powers St
Expected Duration: 23 Jun 2025 - 28 Jul 2025
All eastbound lanes, closed for water work. A median cross-over will occur to allow one westbound and one eastbound lane available at all times. Backlane access on Andrews St servicing Dufferin and Stella closed. Please access the backlane from Powers St.
At Guy Savoie Dr
Expected Duration: 17 Jun 2025 - 21 Jul 2025
Westbound shoulder lane, closed for water work.
Dawson Rd N to Panet Rd
Expected Duration: 05 Dec 2024 - 05 Dec 2024
All eastbound lanes, all westbound lanes, closed for water work. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Guy Savoie Dr to Plessis Rd
Expected Duration: 24 Jun 2025 - 23 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
Plessis Rd to Ravenhurst St
Expected Duration: 20 May 2025 - 04 Jul 2025
All westbound lanes closed for street construction/maintenance. Starting Friday, June 27: All westbound & eastbound lanes closed for street construction/maintenance. Local access only.
Jim Smith Dr to Taunus Dr
Expected Duration: 09 Jun 2025 - 21 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Fermor Av to St Vital Bridge
Expected Duration: 09 May 2025 - 11 Jul 2025
Northbound curb lane, northbound median lane, southbound curb lane, southbound median lane, southbound left turn storage lane, southbound left turn storage lane 2, closed for street construction/maintenance. At least one northbound lane and one southbound lane to remain open at all times.
Kingston Rw WB to Dunkirk Dr SB to Fermor Av
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Southbound median lane, southbound curb lane, closed for street construction/maintenance. Only one lane to be closed at a time.
Blanchard Av to Middle Gate
Expected Duration: 20 Jun 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Cornish Av to Middle Gate
Expected Duration: 02 Jun 2025 - 30 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
Empress St to Empress St E
Expected Duration: 17 Mar 2025 - 17 Oct 2025
Eastbound painted bike lane, north side sidewalk, closed for building construction/maintenance.
Poseidon By to Cambridge St
Expected Duration: 09 Jun 2025 - 29 Aug 2025
Eastbound curb lane, closed for sewer work.
Stafford St to Wentworth St
Expected Duration: 24 Jun 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Derek St to Rockman St
Expected Duration: 18 Jun 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
At Marwood Cr
Expected Duration: 21 Jun 2025 - 21 Jul 2025
Northbound curb lane, closed for water work.
Henderson Hw to Roch St
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Graham Av to Portage Av
Expected Duration: 03 Jul 2025 09:00 a.m. - 03 Jul 2025 03:00 p.m.
Northbound median and curb lanes closed for the Downtown Farmer’s Market. Sidewalks on both sides may also be closed intermittently.
Graham Av to Portage Av
Expected Duration: 10 Jul 2025 09:00 a.m. - 10 Jul 2025 03:00 p.m.
Northbound median and curb lanes closed for the Downtown Farmers' Market. Sidewalks on both sides may also be closed intermittently.
York Av to St Mary Av
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Northbound median lane, west side sidewalk, closed for street construction/maintenance. Northbound median lane will be open for morning and afternoon rush hours.
Wabasha St to Day St
Expected Duration: 24 Jun 2025 - 05 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Blenheim Av to Stranmillis Av
Expected Duration: 18 Feb 2025 - 24 Feb 2025
Northbound curb lane, closed for loading/unloading. Northbound curb lane will be open for morning and afternoon rush hours.
Charter Dr to Oak Point Hw
Expected Duration: 20 May 2025 - 14 Jul 2025
Southbound median lane, closed for electrical/lighting/signals work. Southbound median lane will be open for morning and afternoon rush hours.
Elmhurst Rd to Haney St
Expected Duration: 12 May 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for street construction/maintenance.
Isabel St to Ellen St
Expected Duration: 11 Jun 2025 - 25 Jul 2025
Eastbound curb lane, closed for water work.
Isabel St to Ellen St
Expected Duration: 09 Jun 2025 - 27 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Keewatin St to Cecil St
Expected Duration: 24 Jun 2025 - 01 Aug 2025
Bleau Av to Harper Av
Expected Duration: 30 Jun 2025 - 18 Jul 2025
Westbound curb lane, closed for sewer work.
Des Meurons St to St Marys Rd
Expected Duration: 02 Jul 2025 - 04 Jul 2025
Westbound curb lane, closed for sewer work.
Agnes St to Maryland St
Expected Duration: 04 Jun 2025 - 03 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
Carlton St to Donald St
Expected Duration: 26 Jun 2025 - 21 Jul 2025
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, south side sidewalk, closed for street construction/maintenance. One lane in each direction will remain open at all times.
Empress St to Strathcona St
Expected Duration: 20 Jun 2025 - 27 Jun 2025
Fri, June 20 18:00 - Mon, June 23 07:00: All lane and sidewalks closed at the rail crossing for rail/street construction/maintenance. Use alternate routes. Mon, June 23 07:00 - Fri, June 27 15:00: One lane and one sidewalk in each direction closed at the rail crossing for rail/street construction/maintenance.
Ferry Rd to Berry St
Expected Duration: 02 Jul 2025 - 01 Aug 2025
All eastbound lanes, closed for electrical/lighting/signals work. A median cross-over will occur to provide one Eastbound and one Westbound travel lane at all times.
Yukon Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Westway to East Way
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Northbound curb lane, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
McGregor St to Powers St
Expected Duration: 19 May 2025 - 27 Jun 2025
Westbound curb lane, closed for sewer work. Westbound curb lane will be open for morning rush hour.
Beliveau Rd to End
Expected Duration: 07 Jul 2025 - 12 Sep 2025
All southbound lanes, closed for water work.
Ellice Av to St Matthews Av
Expected Duration: 26 Jun 2025 - 03 Jul 2025
Southbound curb lane, southbound median lane, east side sidewalk, closed for film production or special event/festival.
Ellice Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Westminster Av to Preston Av
Expected Duration: 10 Jul 2025 - 10 Jul 2025
All lanes and west side sidewalk, closed for the Wolseley Farmers Market. All lanes will be open for morning rush hour.
Westminster Av to Preston Av
Expected Duration: 08 Jul 2025 - 08 Jul 2025
All lanes and west side sidewalk, closed for the Wolseley Farmers Market. All lanes will be open for morning rush hour.
Westminster Av to Preston Av
Expected Duration: 01 Jul 2025 - 01 Jul 2025
All lanes and west side sidewalk, closed for the Wolseley Farmers Market. All lanes will be open for morning rush hour.
Westminster Av to Preston Av
Expected Duration: 03 Jul 2025 - 03 Jul 2025
All lanes and west side sidewalk, closed for the Wolseley Farmers Market. All lanes will be open for morning rush hour.
Sutherland Av to Barber St
Expected Duration: 10 Jun 2025 - 11 Jul 2025
Westbound curb lane, closed for electrical/lighting/signals work.
Traverse Av to Kenny St
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Back lane/public lane, closed for electrical/lighting/signals work. Back lane/Public lane will be open for morning and afternoon rush hours.
Preston Av to Westminster Av
Expected Duration: 08 Jul 2025 - 08 Jul 2025
All northbound lanes, all southbound lanes, closed for building construction/maintenance. All northbound lanes will be open for morning and afternoon rush hours. All southbound lanes will be open for morning and afternoon rush hours.
At Lismer Cr
Expected Duration: 09 Jun 2025 - 07 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Cambridge St to Oxford St
Expected Duration: 30 Jun 2025 - 22 Aug 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Vanderbilt Dr to Scurfield Bv
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Powers St to Andrews St
Expected Duration: 23 Jun 2025 - 31 Jan 2026
North side sidewalk, closed for building construction/maintenance.
Broadway to Assiniboine Av
Expected Duration: 12 Nov 2024 - 01 Dec 2025
East side sidewalk, closed for building construction/maintenance.
Broadway to St Mary Av
Expected Duration: 27 Jun 2025 - 14 Jul 2025
Northbound curb lane, back lane/public lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Graham Av to Portage Av
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Northbound median lane, west side sidewalk, closed for communications work. Northbound median lane will be open for morning and afternoon rush hours.
York Av to St Mary Av
Expected Duration: 02 Apr 2025 - 31 Oct 2025
Patio installed on the Northbound curb lane and east sidewalk; pedestrian access remains open.
St Marys Rd to St David Rd
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
At Fairlane Av
Expected Duration: 26 May 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Ellice Av to Portage Av
Expected Duration: 09 May 2025 - 13 May 2025
All lanes closed for building construction/maintenance. All lanes open for peak hours.
Furby Pl to Portage Av
Expected Duration: 02 Dec 2024 - 02 Feb 2026
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Sargent Av to Ellice Av
Expected Duration: 02 Jun 2025 - 08 Aug 2025
Two-hour parking restriction temporarily lifted to accommodate for road construction in the area.
Church Av to Mountain Av
Expected Duration: 27 Jun 2025 - 31 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Wolseley Av to Westminster Av
Expected Duration: 14 Jun 2025 - 18 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Portage Av to Graham Av
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Southbound median lane, southbound middle lane, closed for street construction/maintenance. Only one southbound lane to be closed at a time.
St Mary Av to York Av
Expected Duration: 13 Jun 2025 - 07 Jul 2025
Southbound median lane, east side sidewalk, closed for street construction/maintenance. Southbound median lane will be open for morning and afternoon rush hours.
St Mary Av to York Av
Expected Duration: 27 Mar 2025 - 28 Mar 2025
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Burnett Av to Furniture Pk
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for morning and afternoon rush hours.
Chancellor Dr to End
Expected Duration: 09 Jul 2024 - 30 Nov 2025
Southbound curb lane, closed for building construction/maintenance.
At Cavalier Dr
Expected Duration: 26 May 2025 - 04 Jul 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
St Mary Av to Portage Av
Expected Duration: 14 May 2024 - 07 Jul 2025
Northbound curb lane, closed for building construction/maintenance.
St Mary Av to Portage Av
Expected Duration: 11 Jul 2023 - 07 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Brazier St to Stadacona St
Expected Duration: 12 May 2025 - 01 Aug 2025
All eastbound lanes, all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance. At least one sidewalk to remain open for access.
At Wolever Av
Expected Duration: 01 May 2025 - 03 May 2025
Traverse Av to Kenny St
Expected Duration: 19 Jun 2025 - 21 Jul 2025
Westbound curb lane, north side sidewalk, closed for water work. Westbound curb lane will be open for morning and afternoon rush hours.
Youville St to End
Expected Duration: 07 Jul 2025 - 11 Jul 2025
Back lane/public lane, closed for gas work. Back lane/Public lane will be open for morning and afternoon rush hours.
Youville St to Traverse Av
Expected Duration: 25 Jun 2025 - 04 Jul 2025
All lanes, westbound protected bike lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Only one lane and one sidewalk closed at a time. Cyclists use the North sidewalk and yield to pedestrians when the bike lane is closed.
Carlton St to Edmonton St
Expected Duration: 03 Jul 2025 - 03 Jul 2025
North sidewalk closed for the Downtown Farmers' Market.
Carlton St to Edmonton St
Expected Duration: 10 Jul 2025 - 10 Jul 2025
North sidewalk closed for the Downtown Farmers' Market.
Carlton St to Garry St
Expected Duration: 29 Jun 2025 - 07 Jul 2025
All eastbound and westbound lanes will be closed to vehicular traffic.
Edmonton St to Carlton St
Expected Duration: 23 Jun 2025 - 14 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Garry St to Main St
Expected Duration: 23 Jun 2025 - 28 Jun 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Hargrave St to Donald St
Expected Duration: 02 Jul 2025 - 05 Jul 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Henderson Hw to Irving Pl
Expected Duration: 24 Jun 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Chalfont Rd to Shaftesbury Bv
Expected Duration: 02 Jul 2025 - 06 Aug 2025
Eastbound curb lane, closed for street construction/maintenance.
Chalfont Rd to Shaftesbury Bv
Expected Duration: 07 Jul 2025 - 08 Jul 2025
Eastbound curb lane, closed for communications work. Eastbound curb lane will be open for morning and afternoon rush hours.
Stafford St to Pembina Hw
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, south side sidewalk, north side sidewalk, closed for street construction/maintenance. Only one lane in each directions and one sidewalk to be closed at a time. All lanes open for peak hours.
Lagimodiere Bv to Silver Fields Ln
Expected Duration: 10 Jun 2025 - 07 Jul 2025
Eastbound curb lane, westbound curb lane, westbound middle lane, south side sidewalk, closed for communications work. All lanes to be open for peak hours. Only one lane in each direction to be closed at a time.
Pearn Av to Ham St
Expected Duration: 10 Jul 2025 - 24 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
At Louelda St
Expected Duration: 12 May 2025 - 01 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
At Witham Rd
Expected Duration: 09 Jun 2025 - 14 Jul 2025
Eastbound curb lane, north side sidewalk, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Wentworth St to Stafford St
Expected Duration: 12 Mar 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Rover Av to Rex Av
Expected Duration: 09 Jun 2025 - 21 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Berkshire By to Wickham Rd
Expected Duration: 02 Jul 2025 - 12 Sep 2025
All southbound lanes, closed for water work.
Cumberland Av to Notre Dame Av
Expected Duration: 19 Jun 2025 - 14 Jul 2025
Northbound curb lane, northbound middle lane, northbound median lane, east side sidewalk, closed for electrical/lighting/signals work.
Graham Av to Portage Av
Expected Duration: 26 Jun 2025 - 21 Jul 2025
Northbound median lane, west side sidewalk, closed for street construction/maintenance. Northbound median lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Northbound median lane, closed for communications work. Northbound median lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 17 Jun 2025 - 04 Jul 2025
Northbound curb lane, northbound median lane, back lane/public lane, west side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours.
Elizabeth Rd to Hansford Rd
Expected Duration: 02 Jul 2025 - 28 Jul 2025
Southbound curb lane, closed for street construction/maintenance.
St David Rd to St Marys Rd
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Westbound curb lane, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
St Marys Rd to Neepawa St
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Kirkbridge Dr to Groveland By
Expected Duration: 26 Jun 2025 - 27 Jun 2025
Westbound curb lane, closed for loading/unloading.
Arnold Av to Morley Av
Expected Duration: 02 Dec 2024 - 20 Feb 2026
Southbound curb lane, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Raleigh St to Gateway Rd
Expected Duration: 16 Jun 2025 - 11 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Only one lane to be closed at a time and all lanes will be open for morning and afternoon rush hours.
Harper Av to Winakwa Rd
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Nathaniel St to Wilton St
Expected Duration: 25 Apr 2025 - 04 Jul 2025
Eastbound curb lane, closed for sewer work.
Brazier St to Henderson Hw
Expected Duration: 23 Jun 2025 - 07 Jul 2025
Westbound curb lane, eastbound curb lane, closed for sewer work.
Henderson Hw to Kildonan Dr
Expected Duration: 24 Jun 2025 - 08 Jul 2025
North side sidewalk, closed for street construction/maintenance.
Watt St to Roch St
Expected Duration: 26 Jun 2025 - 18 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Greene Av to Roberta Av
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for water work.
Greene Av to Roberta Av
Expected Duration: 02 May 2025 - 02 May 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Helmsdale Av to Kimberly Av
Expected Duration: 12 Jun 2025 - 07 Jul 2025
Southbound median lane, west side sidewalk, closed for sewer work.
McIvor Av to Strood Av
Expected Duration: 07 Jul 2025 - 11 Jul 2025
Northbound shoulder lane, east side sidewalk, closed for gas work. Northbound shoulder lane will be open for morning and afternoon rush hours.
McLeod Av to Devon Av
Expected Duration: 10 Jun 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, northbound middle lane, east side sidewalk, west side sidewalk, closed for gas work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Mighton Av to Dearborn Av
Expected Duration: 13 Jun 2025 - 07 Jul 2025
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
Ottawa Av to Bredin Dr
Expected Duration: 12 Jun 2025 - 07 Jul 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Strood Av to Bonner Av
Expected Duration: 26 Jun 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for gas work. Northbound curb lane will be open for morning and afternoon rush hours.
Kimberly Av to End
Expected Duration: 04 Jun 2025 - 18 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Shorehill Dr to Bedard Cr
Expected Duration: 24 Jun 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Pinedale Av to Monck Av
Expected Duration: 03 Jul 2025 - 03 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for film production or special event/festival.
Dubuc St to Eugenie St
Expected Duration: 30 May 2025 - 08 Jul 2025
Southbound curb lane, closed for loading/unloading.
St Annes Rd to End
Expected Duration: 19 Jun 2025 - 10 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
Pembina Hw to Hudson St
Expected Duration: 18 Jun 2025 - 29 Aug 2025
A temporary accessible parking stall has been installed in the westbound curb lane to accommodate ongoing street construction in the area.
Ormiston Rd to Harper Av
Expected Duration: 02 Jul 2025 - 28 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Corydon Av to McMillan Av
Expected Duration: 12 Jul 2025 - 12 Jul 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Corydon Av to McMillan Av
Expected Duration: 05 Jul 2025 - 05 Jul 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
At Island Shore Bv
Expected Duration: 26 May 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
St Annes Rd to Des Meurons St
Expected Duration: 28 May 2025 - 11 Jul 2025
Eastbound curb lane, south side sidewalk, closed for water work.
St Annes Rd to Des Meurons St
Expected Duration: 24 Jun 2025 - 21 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Ellice Av to Sargent Av
Expected Duration: 14 May 2025 - 14 Jul 2025
Southbound curb lane, closed for loading/unloading.
Lansdowne Av to Aikins St
Expected Duration: 13 May 2025 - 01 Aug 2025
All eastbound lanes, south sidewalk closed for street construction/maintenance. At least one eastbound lane and sidewalk will be open at all times.
Main St to Lansdowne Av
Expected Duration: 12 May 2025 - 29 Aug 2025
All westbound lanes, north side sidewalk, closed for street construction/maintenance. At least one westbound lane will be open at all times. Left-turns restricted from Westbound Inkster Blvd to Southbound McPhillips St starting Monday, June 2.
Sinclair St to Main St
Expected Duration: 12 May 2025 - 30 Jun 2025
All eastbound lanes, south sidewalk closed for street construction/maintenance. At least one eastbound lane and sidewalk will be open at all times.
Wyatt Rd to Mandalay Dr
Expected Duration: 27 Jun 2025 - 14 Jul 2025
Westbound median lane, closed for landscaping/tree maintenance. Westbound median lane will be open for morning and afternoon rush hours.
Abinojii Mikanah to Tidal Cv
Expected Duration: 03 Jul 2025 - 16 Jul 2025
All lanes closed in both directions for street construction/maintenance. At least one lane will be open at all times in each direction.
Centre St to Park West Dr
Expected Duration: 28 Jan 2025 - 30 Sep 2025
North side sidewalk, closed for building construction/maintenance.
Centre St to Park West Dr
Expected Duration: 09 Nov 2022 - 30 Nov 2024
North side sidewalk, closed for building construction/maintenance.
King St to Main St
Expected Duration: 05 Jul 2025 - 06 Jul 2025
All eastbound lanes, south side sidewalk, closed for film production or special event/festival.
King St to Main St
Expected Duration: 04 Jan 2022 - 08 Jan 2026
Eastbound median lane, closed for loading/unloading.
Sheppard St to Marbury Rd
Expected Duration: 05 Jun 2025 - 30 Jun 2025
All lanes closed for electrical/lighting/signals work. Only one lane in each direction will be closed at a time. All lanes will be open for morning and afternoon rush hours.
Pembina Hw to Osborne St
Expected Duration: 22 Jun 2025 - 01 Jul 2027
All eastbound lanes, all westbound lanes, north side sidewalk, closed for building construction/maintenance.
Speers Rd to Maplehurst Rd
Expected Duration: 16 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Brazier St to Roch St
Expected Duration: 10 Jun 2025 - 14 Jul 2025
Westbound curb lane, north side sidewalk, closed for water work.
Lilac St to Pembina Hw
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
At Betournay St
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Nairn Av to Thomas Av
Expected Duration: 13 Jul 2025 02:00 p.m. - 13 Jul 2025 11:59 p.m.
All northbound lanes, all southbound lanes, closed for film production or special event/festival.
Nairn Av to Thomas Av
Expected Duration: 06 Jul 2025 02:00 p.m. - 06 Jul 2025 11:59 p.m.
All northbound lanes, all southbound lanes, closed for film production or special event/festival.
Burrows Av to Manitoba Av
Expected Duration: 23 Jun 2025 - 04 Jul 2025
Southbound curb lane, west side multi-use path closed for communications work. Southbound curb lane will be open for morning and afternoon rush hours.
William Av W to Ross Av W
Expected Duration: 01 Jul 2025 - 01 Aug 2025
Northbound curb lane, closed for water work.
Douglas Henning By to Waverley St
Expected Duration: 17 Jun 2025 - 01 Aug 2025
East side sidewalk, closed for sewer work.
Ken Wong Bay to Country Meadow Bv
Expected Duration: 06 May 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Ken Wong Bay to Douglas Henning By
Expected Duration: 25 Jun 2025 - 18 Jul 2025
Northbound curb lane, southbound median lane, closed for sewer work.
Carpathia Rd to Lockston Av
Expected Duration: 17 Jun 2025 - 07 Jul 2025
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
At Assiniboine Av
Expected Duration: 14 Apr 2025 - 14 Nov 2025
East side sidewalk, closed for building construction/maintenance.
York Av to Broadway
Expected Duration: 08 Jul 2025 - 08 Jul 2025
East side sidewalk, closed for loading/unloading.
Powers St to McGregor St
Expected Duration: 07 Feb 2025 - 04 Jul 2025
Westbound curb lane, closed for sewer work.
Leola St to Wabasha St
Expected Duration: 24 Jun 2025 - 04 Jul 2025
Westbound curb lane, closed for street construction/maintenance. Westbound curb lane will be open for afternoon rush hour.
At Brewster By
Expected Duration: 29 May 2025 - 07 Jul 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
Irving Pl to Hawthorne Av
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
At Chief Peguis Tl
Expected Duration: 08 Jul 2025 - 08 Jul 2025
Eastbound median lane, closed for street construction/maintenance. Eastbound median lane will be open for morning and afternoon rush hours.
Westwood Dr to Carroll Rd
Expected Duration: 11 Jun 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Kullman St to Molson St
Expected Duration: 12 May 2025 - 01 Aug 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance. One lane to remain open for local access.
Roch St to Watt St
Expected Duration: 23 Jun 2025 - 30 Jun 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning rush hour.
Burrows Av to Herman Av
Expected Duration: 24 Jun 2025 - 11 Jul 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Kurt Av to Flye Av
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Silver Av to Ness Av
Expected Duration: 07 Jul 2025 - 09 Jul 2025
Southbound curb lane, closed for sewer work.
Bannatyne Av to William Av
Expected Duration: 14 Jul 2025 - 29 Jul 2025
Northbound curb lane, east side sidewalk, closed for film production or special event/festival.
Bannatyne Av to William Av
Expected Duration: 16 Nov 2024 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
James Av to William Av
Expected Duration: 26 Jun 2025 - 27 Jun 2025
Northbound median lane, west side sidewalk, closed for electrical/lighting/signals work. Northbound median lane will be open for morning and afternoon rush hours.
William Av to James Av
Expected Duration: 04 Jul 2025 - 04 Jul 2025
Northbound curb lane, east side sidewalk, closed for film production or special event/festival.
William Av to James Av
Expected Duration: 04 Jul 2025 - 06 Jul 2025
Northbound median lane, northbound curb lane, east side sidewalk, closed for film production or special event/festival.
William Av to James Av
Expected Duration: 18 Mar 2024 - 16 Jul 2025
West side sidewalk, closed for building construction/maintenance.
Roch St to Rothesay St
Expected Duration: 01 Jul 2025 - 20 Aug 2025
Eastbound curb lane, closed for street construction/maintenance.
Killarney St to Ramp Kingston to Dunkirk NB
Expected Duration: 27 Jun 2025 - 21 Jul 2025
Eastbound curb lane, closed for water work.
Ramp Dunkirk SB to Kingston EB to Ramp Kingston to Dunkirk NB
Expected Duration: 17 Jun 2025 - 04 Jul 2025
All westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
St Marys Rd to Mager Dr W
Expected Duration: 27 Jun 2025 - 21 Jul 2025
Westbound median lane, westbound curb lane, closed for water work. One lane to remain open at all times.
Oak St to Lindsay St
Expected Duration: 25 Jun 2025 - 07 Jul 2025
Westbound curb lane, eastbound curb lane, closed for street construction/maintenance. One lane to remain open at all times for local traffic.
St James Bridge to Portage Av
Expected Duration: 05 Jul 2025 - 06 Jul 2025
Northbound St James Bridge (Route 90) exit ramp to Eastbound Portage Ave closed for street construction/maintenance. Exit ramp to be open for all peak hours.
Pembina Hw to Hillmartin Dr
Expected Duration: 02 Sep 2024 - 28 Nov 2025
North side sidewalk, closed for building construction/maintenance.
Meadowood Dr to Homewood Dr
Expected Duration: 11 Jun 2025 - 30 Jun 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Kimberly Av to Snowdon Av
Expected Duration: 12 May 2025 - 01 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
King Edward St to Sanderson Av
Expected Duration: 24 Jun 2025 - 04 Jul 2025
Eastbound curb lane, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Daly St S to End
Expected Duration: 08 Jul 2025 - 09 Jul 2025
Eastbound curb lane, closed for sewer work.
Gordon Av to End
Expected Duration: 12 May 2025 - 01 Aug 2025
All lanes closed for street construction/maintenance. One lane to remain open for local access.
Chief Peguis Tl to Springfield Rd
Expected Duration: 28 May 2025 - 02 Jul 2025
Northbound shoulder lane, closed for loading/unloading.
Dawson Rd N to Maginot St
Expected Duration: 30 Jun 2025 - 21 Jul 2025
Southbound curb lane, closed for sewer work.
Fermor Av to Cottonwood Rd
Expected Duration: 02 Jul 2025 - 04 Jul 2025
All northbound lanes closed for street construction/maintenance. Only one northbound lane to be closed at a time and all lanes will be open for morning and afternoon rush hours.
Regent Av W to Lagimodiere Bv Overpass over CNR Redditt
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Southbound curb lane, southbound shoulder lane, closed for sewer work.
Markham Rd to End
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Southbound curb lane, closed for gas work. Southbound curb lane will be open for morning and afternoon rush hours.
Abinojii Mikanah to McGurran Pl
Expected Duration: 26 May 2025 - 07 Jul 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Taylor Av to Mathers Av
Expected Duration: 10 Jun 2025 - 04 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
Ellice Av to Sargent Av
Expected Duration: 02 Jun 2025 - 08 Aug 2025
Two-hour parking restriction temporarily lifted to accommodate for road construction in the area.
Notre Dame Av to Cumberland Av
Expected Duration: 02 Jun 2025 - 18 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
At McPhillips St
Expected Duration: 19 May 2025 - 01 Aug 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Main St to Aikins St
Expected Duration: 28 May 2025 - 05 Jun 2025
Westbound curb lane, closed for building construction/maintenance.
Main St to Aikins St
Expected Duration: 02 Apr 2025 - 30 Jun 2025
North side sidewalk, closed for building construction/maintenance.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
McKenzie St to McGregor St
Expected Duration: 08 Jun 2025 - 18 Jul 2025
All eastbound lanes, all northbound lanes, south side sidewalk, closed for water work.
Brazier St to Henderson Hw
Expected Duration: 13 Jun 2025 - 07 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Kirkdale St to Coniston St
Expected Duration: 03 Jul 2025 - 03 Jul 2025
Back lane/public lane, closed for film production or special event/festival.
McPhillips St to Garden Park Dr
Expected Duration: 03 Jul 2025 - 03 Jul 2025
Eastbound curb lane, closed for sewer work. Eastbound curb lane will be open for morning and afternoon rush hours.
Jessie Av to Corydon Av
Expected Duration: 11 Jul 2025 - 11 Jul 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Jessie Av to Corydon Av
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Grosvenor Av to Kingsway
Expected Duration: 15 Jun 2025 - 14 Jul 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for water work.
Portage Av to Westminster Av
Expected Duration: 07 Jan 2025 - 08 Jan 2025
All southbound lanes, west side sidewalk, closed for building construction/maintenance. All southbound lanes will be open for morning and afternoon rush hours.
Paterson St to Penrose Pl
Expected Duration: 25 Jun 2025 - 21 Jul 2025
Northbound curb lane, closed for sewer work.
Dorothy St to Tecumseh St
Expected Duration: 26 Jun 2025 - 25 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Weston St to Blake St
Expected Duration: 01 Jul 2025 - 06 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Westbrook St to Rorie St
Expected Duration: 09 Jul 2025 - 14 Jul 2025 11:59 p.m.
Westbound curb lane, closed for film production or special event/festival.
At Paterson St
Expected Duration: 02 Jul 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Antrim Rd to Hobbs Cr
Expected Duration: 02 Jul 2025 - 31 Jul 2025
Northbound curb lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for sewer work.
Higgins Av to Stadacona St
Expected Duration: 23 May 2025 - 31 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Pedestrian and cyclist access using the southbound curb lane for crossing the bridge.
Baltimore Rd to Oakwood Av
Expected Duration: 05 Jul 2025 - 05 Jul 2025
All northbound lanes, all southbound lanes, closed for block party.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Ness Av to Silver Av
Expected Duration: 11 Jun 2025 - 02 Jul 2025
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for morning and afternoon rush hours.
Andrews St to Buller St
Expected Duration: 02 Jul 2025 - 25 Jul 2025
Westbound curb lane, closed for sewer work.
Carruthers Av to Lansdowne Av
Expected Duration: 28 Mar 2025 - 09 Oct 2026
West side sidewalk, closed for building construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 20 Jun 2025 - 14 Jul 2025
Southbound curb lane, closed for street construction/maintenance.
Lansdowne Av to Matheson Av E
Expected Duration: 13 Jun 2025 - 07 Jul 2025
Northbound curb lane, southbound curb lane, northbound middle lane 2, west side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Leila Av to Red River Bv
Expected Duration: 23 May 2025 - 31 Jul 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Logan Av to Alexander Av
Expected Duration: 26 May 2025 - 07 Jul 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Lombard Av to Bannatyne Av
Expected Duration: 30 Jun 2025 - 14 Jul 2025
Northbound middle lane 2, closed for electrical/lighting/signals work.
Margaret Av to Templeton Av
Expected Duration: 22 Jun 2025 - 21 Jul 2025
Southbound curb lane, closed for sewer work.
Murray Av to Ridgecrest Av
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Pioneer Av to Portage Av E
Expected Duration: 03 Jul 2025 - 03 Jul 2025
Northbound curb lane, northbound middle lane, closed for loading/unloading. Northbound curb lane will be open for morning and afternoon rush hours. Northbound middle lane will be open for morning and afternoon rush hours.
Pioneer Av to Portage Av E
Expected Duration: 30 Jun 2025 - 25 Sep 2026
Northbound curb lane, east side sidewalk, closed for loading/unloading. Northbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Graham Av
Expected Duration: 04 Jul 2025 - 21 Oct 2025
West side sidewalk, closed for building construction/maintenance.
Portage Av to Lombard Av
Expected Duration: 11 Dec 2024 - 01 Jul 2025
Pedestrian Effect: February 1979 – Thu, June 26, 2025: Sidewalk crossings closed. Fri, June 27: After 45 years, the winds of change have swept through Canada’s windiest corner—Portage & Main reopens to pedestrians! Step back into the heart of the city—and into a piece of Winnipeg history. Vehicle Effect: Wed, June 18 – Thu, June 26: Northbound & Southbound curb lanes closed. Fri, June 27: Construction’s complete, but the corner’s busier—pedestrians are back at Portage & Main. Drive with care!
Portage Av to Pioneer Av
Expected Duration: 04 Dec 2024 - 01 Jul 2025
Pedestrian Effect: February 1979 – Thu, June 26, 2025: Sidewalk crossings closed. Fri, June 27: After 45 years, the winds of change have swept through Canada’s windiest corner—Portage & Main reopens to pedestrians! Step back into the heart of the city—and into a piece of Winnipeg history. Vehicle Effect: Wed, June 18 – Thu, June 26: Northbound & Southbound curb lanes closed. Fri, June 27: Construction’s complete, but the corner’s busier—pedestrians are back at Portage & Main. Drive with care!
Sgt Tommy Prince St to McPhillips St
Expected Duration: 27 Jun 2025 - 14 Jul 2025
Westbound curb lane, closed for landscaping/tree maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Osborne St to Hay St
Expected Duration: 10 Jun 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for sewer work.
Charter Dr to Finestone St
Expected Duration: 17 Jun 2025 - 14 Jul 2025
Eastbound curb lane, westbound curb lane, closed for electrical/lighting/signals work. Local traffic to be maintained. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Dawson Rd N to Dupuy Av
Expected Duration: 18 Jun 2025 - 21 Jul 2025
All lanes closed for sewer work. One lane in each direction to remain open at all times.
Dawson Rd N to Turenne St
Expected Duration: 18 Jun 2025 - 21 Jul 2025
Eastbound curb lane, closed for sewer work.
Des Meurons St to Youville St
Expected Duration: 01 Apr 2025 - 05 Sep 2025
South side sidewalk, closed for building construction/maintenance.
Des Meurons St to Youville St
Expected Duration: 20 Jun 2025 - 21 Jul 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Tache Av to Kenny St
Expected Duration: 19 Jun 2025 - 21 Jul 2025
Eastbound curb lane, closed for water work.
Pembina Hw to Snow St
Expected Duration: 16 Jun 2025 - 08 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Pembina Hw to University Cr
Expected Duration: 01 Jul 2025 04:00 p.m. - 01 Jul 2025 11:59 p.m.
IG Field Traffic Plan - additional traffic controls in place for special event access, parking, and egress
Pembina Hw to University Cr
Expected Duration: 09 Jul 2025 03:00 p.m. - 11 Jul 2025 01:00 a.m.
IG Field Traffic Plan - additional traffic controls in place for special event access, parking, and egress
Masterton Cr to Jefferson Av
Expected Duration: 05 Jun 2025 - 30 Jun 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Clarence Av to Waller Av
Expected Duration: 02 Jul 2025 - 26 Sep 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Logan Av to Austin St
Expected Duration: 01 Jun 2024 - 17 Sep 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Broadway to Fawcett Av
Expected Duration: 10 Jul 2025 - 24 Jul 2025
All southbound lanes closed for street construction/maintenance. At least one southbound lane will remain open at all times. At least two southbound lanes will be open for PM peak hours.
Portage Av to Broadway
Expected Duration: 10 Jul 2023 - 01 Dec 2025
West side sidewalk, closed for building construction/maintenance.
At Mathers Av
Expected Duration: 23 Jun 2025 - 27 Jun 2025
Northbound curb lane, closed for loading/unloading.
Parr St to Copp St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Harkness St to Queen Elizabeth Way
Expected Duration: 02 Jul 2025 - 04 Jul 2025
Eastbound median lane, eastbound middle lane, north side sidewalk, closed for building construction/maintenance. Eastbound middle lane will be open for morning and afternoon rush hours.
Harkness St to Queen Elizabeth Way
Expected Duration: 24 May 2025 - 27 Jun 2025
Eastbound middle lane, closed for water work.
River Av to End
Expected Duration: 02 Jul 2025 - 30 Sep 2025
West side sidewalk, closed for building construction/maintenance.
Cottonwood Rd to Westmount Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Parr St to Copp St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Westwood Dr to Kirkfield St
Expected Duration: 24 Jun 2025 - 02 Jul 2025
Eastbound median lane, westbound curb lane, closed for street construction/maintenance. Eastbound median lane will be open for morning rush hour. Westbound curb lane will be open for morning rush hour.
At Tecumseh St
Expected Duration: 09 Sep 2024 - 30 Sep 2025
North side sidewalk, closed for building construction/maintenance.
Hargrave St to King St
Expected Duration: 12 Jul 2025 - 12 Jul 2025
All eastbound lanes, north side sidewalk, closed for film production or special event/festival.
St Matthews Av to Ellice Av
Expected Duration: 02 Jun 2025 - 15 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
At Dunkley St
Expected Duration: 14 Nov 2024 - 28 Nov 2024
Westbound shoulder lane, closed for gas work.
Anderson Av to Smithfield Av
Expected Duration: 02 Jun 2025 - 15 Aug 2025
Northbound median lane, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Forrest Av to Partridge Av
Expected Duration: 17 Jun 2025 - 14 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Jarvis Av to Stella Av
Expected Duration: 19 Jun 2025 - 25 Jul 2025
Southbound curb lane, closed for water work.
Mountain Av to Anderson Av
Expected Duration: 29 May 2025 - 27 Jun 2025
Parking restrictions lifted on McGregor Ave to accommodate emergency relief.
Smithfield Av to McAdam Av
Expected Duration: 23 Jun 2025 - 04 Jul 2025
Southbound median lane, closed for street construction/maintenance.
Henderson Hw to Rothesay St
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Eastbound curb lane, westbound curb lane, closed for water work.
Church Av to Polson Av
Expected Duration: 12 May 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance. One lane to remain open at all times.
Inkster Bv to Lansdowne Av
Expected Duration: 12 May 2025 - 15 Aug 2025
All lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
Jarvis Av to Stella Av
Expected Duration: 23 Jun 2025 - 01 Aug 2025
Southbound curb lane, all northbound lanes, closed for water work.
Pritchard Av to Manitoba Av
Expected Duration: 25 Jun 2025 - 21 Jul 2025
Northbound curb lane, east side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours.
Gateway Rd to London St
Expected Duration: 02 Jul 2025 - 16 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Sargent Av to Ellice Av
Expected Duration: 02 Jun 2025 - 07 Aug 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Daly St N to Hugo St N
Expected Duration: 17 Jun 2025 - 27 Jun 2025
Westbound curb lane, closed for loading/unloading.
Alfred Av to Aberdeen Av
Expected Duration: 18 Jun 2025 - 30 Jun 2025
Northbound middle lane, closed for sewer work.
At Selkirk Av
Expected Duration: 05 Jul 2025 - 06 Jul 2025
Mill & Fill operations will take place at the intersection of McPhillips St & Selkirk Ave. Intermittent closures will occur in all directions; however, at least one lane will remain open in each direction at all times to maintain traffic flow. Expect delays.
Elgin Av to Pacific Av
Expected Duration: 27 Jun 2025 - 02 Jul 2025
Northbound curb lane, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
Polson Av to Lansdowne Av
Expected Duration: 15 May 2025 - 29 Aug 2025
Northbound curb lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
Swailes Av to North Point Bv
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Templeton Av to Swailes Av
Expected Duration: 28 May 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, west side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
At Woodford By
Expected Duration: 05 Jun 2025 - 25 Jul 2025
Westbound curb lane, closed for sewer work. Westbound curb lane will be open for morning and afternoon rush hours.
Bismarck St to Moroz St
Expected Duration: 17 Jun 2025 - 21 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
St Mary Av to Portage Av
Expected Duration: 17 Nov 2024 - 16 Nov 2026
Northbound curb lane, northbound middle lane, northbound middle lane 2, east side sidewalk, closed for building construction/maintenance.
York Av to St Mary Av
Expected Duration: 02 Jul 2025 - 27 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Inksbrook Dr to Haggart Av
Expected Duration: 01 Jul 2025 - 14 Jul 2025
All northbound lanes, closed for street construction/maintenance.
Inksbrook Dr to Haggart Av
Expected Duration: 14 Jul 2025 - 25 Jul 2025
All southbound lanes, closed for street construction/maintenance.
Pembina Hw to Riverside Dr
Expected Duration: 23 Jun 2025 - 25 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Blanchard Av to End
Expected Duration: 04 Jun 2025 - 30 Jun 2025
Temporary Accessible Permit Parking Only location installed in the Southbound curb lane to accommodate for nearby road construction.
Cornish Av to Blanchard Av
Expected Duration: 23 Jun 2025 - 30 Jun 2025
Southbound curb lane, closed for loading/unloading.
Cornish Av to End
Expected Duration: 02 Jun 2025 - 30 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
Logan Av to End
Expected Duration: 27 Jun 2025 - 31 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Mountain Av to Church Av
Expected Duration: 16 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
King Edward St to Pipeline Rd
Expected Duration: 09 Jun 2025 - 31 Oct 2025
Westbound curb lane, closed for street construction/maintenance.
London St to Besant St
Expected Duration: 19 Jun 2025 - 18 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Hay St to Osborne St
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Westbound curb lane, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Osborne St to Hay St
Expected Duration: 02 Dec 2024 - 20 Feb 2026
All eastbound lanes, south side sidewalk, closed for building construction/maintenance.
Fife St to McPhillips St
Expected Duration: 09 Jun 2025 - 18 Jul 2025
Westbound curb lane, westbound median lane, north side sidewalk, closed for street construction/maintenance. A median cross-over will occur providing one westbound and one eastbound travel lanes.
Main St to Charles St
Expected Duration: 11 Mar 2025 - 11 Mar 2025
North side sidewalk, closed for building construction/maintenance.
London St to Grey St
Expected Duration: 09 Jul 2025 - 16 Jul 2025
Westbound curb lane, eastbound curb lane, closed for street construction/maintenance. At least one lane will remain open at all times for local traffic and all lanes will be open for morning rush hour.
Roch St to Brazier St
Expected Duration: 12 Jun 2025 - 07 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Weedon St to Byars By
Expected Duration: 09 Jul 2025 - 09 Jul 2025
Eastbound curb lane, closed for sewer work. Eastbound curb lane will be open for morning and afternoon rush hours.
Weedon St to Byars By
Expected Duration: 07 Jul 2025 - 07 Jul 2025
Eastbound curb lane, westbound curb lane, closed for sewer work. One lane to remain open at all times. All lanes open for peak hours.
Carsdale Dr to Gateside St
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Westbound curb lane, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Danford Pl to Swinford Wy
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Donan St to Main St
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Endcliffe Pl to Frog Plain Wy
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Jubilee Av to Montague Av
Expected Duration: 26 May 2025 - 11 Jul 2025
Northbound curb lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Only one sidewalk closed at a time.
Taylor Av to Grant Av
Expected Duration: 13 Jan 2025 - 01 Sep 2025
All southbound lanes, west side sidewalk, closed for sewer work.
Duffield St to Guildford St
Expected Duration: 26 Jun 2025 - 03 Jul 2025
Eastbound curb lane, south side sidewalk, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Ferry Rd to Linwood St
Expected Duration: 18 Jun 2025 - 04 Jul 2025
Westbound curb lane, westbound median lane, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours. Westbound median lane will be open for morning and afternoon rush hours.
Seagrim Rd to St Annes Rd
Expected Duration: 19 Jun 2025 - 10 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Cottonwood Rd to Northumbria By
Expected Duration: 14 Jul 2025 - 17 Jul 2025
Westbound curb lane, closed for loading/unloading.
At Antrim Rd
Expected Duration: 12 May 2025 - 01 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
Wicklow St to Pembina Hw
Expected Duration: 12 May 2025 - 22 Jul 2025
Time-limited parking restrictions temporary lifted.
Atlas Cr to Lyra Gt
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Atlas Cr to Phoenix St
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Libra St to Orion Cr
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Orion Cr to Lynx Gt
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Arthur St to Smith St
Expected Duration: 30 Jun 2025 - 21 Jul 2025
Westbound curb lane, westbound protected bike lane, eastbound protected bike lane, north side sidewalk, closed for street construction/maintenance. A protected bike lane diversion will be created in the Westbound curb lane.
Bannatyne Av W to Cecil St
Expected Duration: 30 Jun 2025 - 01 Aug 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Dalton Cr to Sherwin Rd
Expected Duration: 14 Jul 2025 - 08 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Home St to Alverstone St
Expected Duration: 26 Jun 2025 - 14 Jul 2025
All westbound lanes and north side sidewalk, closed for electrical/lighting/signals work. Only one westbound lane to be closed at a time and all lanes will be open for morning and afternoon rush hours.
Kate St to Langside St
Expected Duration: 16 Jun 2025 - 18 Jun 2025
North side sidewalk, closed for building construction/maintenance.
McGee St to Maryland St
Expected Duration: 13 Jun 2025 - 13 Jun 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
McGee St to Maryland St
Expected Duration: 08 May 2025 - 08 May 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Smith St to Donald St
Expected Duration: 23 Jun 2025 - 04 Jul 2025
North side sidewalk, closed for building construction/maintenance.
Young St to Furby St
Expected Duration: 04 Jun 2025 - 07 Jul 2025
Westbound median lane, closed for street construction/maintenance.
Nadeau St to Maisonneuve St
Expected Duration: 21 Apr 2025 - 07 Jul 2025
Westbound curb lane, closed for sewer work.
Academy Rd to Kingsway
Expected Duration: 19 May 2025 - 07 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Golspie St to Dundoon St
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Back lane/public lane, closed for street construction/maintenance.
Mabel St to Fisher St
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Westbound curb lane, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Bangor Av to Dublin Av
Expected Duration: 23 Jun 2025 - 15 Aug 2025
All southbound lanes, closed for street construction/maintenance.
Baltimore Rd to Rathgar Av
Expected Duration: 03 Jul 2025 - 03 Jul 2025
Northbound curb lane, closed for film production or special event/festival. Northbound curb lane will be open for morning rush hour.
Bartlet Av to Morley Av
Expected Duration: 14 Apr 2025 - 28 Nov 2025
East side sidewalk, closed for building construction/maintenance.
Gertrude Av to Donald St
Expected Duration: 14 Jul 2025 - 31 Jul 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Gertrude Av to Wardlaw Av
Expected Duration: 13 Feb 2025 - 13 Feb 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Morley Av to Arnold Av
Expected Duration: 02 Dec 2024 - 20 Feb 2026
Parking removal on northbound curb lane for Winnipeg Transit.
Mulvey Av to Don Av
Expected Duration: 20 Jun 2025 - 14 Jul 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Rathgar Av to Churchill Dr WB to Osborne St NB
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Southbound median lane, southbound curb lane, closed for street construction/maintenance. One southbound lane to remain open at all times.
Roslyn Rd to Osborne Bridge
Expected Duration: 28 Apr 2025 - 25 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Stradbrook Av to Wardlaw Av
Expected Duration: 31 Mar 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Memorial Bv to St Mary Av
Expected Duration: 26 Jun 2025 - 31 Aug 2025
West side sidewalk, closed for building construction/maintenance.
Corydon Av to Fleet Av
Expected Duration: 30 Jun 2025 - 22 Aug 2025
Temporary Accessible Permit Parking Only location installed in the Southbound curb lane to accommodate for nearby road construction.
Lily St to Martha St
Expected Duration: 16 Jun 2025 - 04 Jul 2025
North side sidewalk, closed for building construction/maintenance.
Paulin St to Ellen St
Expected Duration: 27 Jun 2025 - 31 Dec 2025
South side sidewalk, closed for building construction/maintenance.
Clyde Rd to Talbot Av
Expected Duration: 29 Nov 2024 - 03 Dec 2024
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for morning rush hour.
Lansdowne Av to Inkster Bv
Expected Duration: 12 May 2025 - 15 Aug 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
McGregor St to Andrews St
Expected Duration: 17 Jun 2025 - 14 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Lochmoor Av to Lagimodiere Bv
Expected Duration: 09 Jul 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Ravelston Av W to El Tassi Dr
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Southbound curb lane and west side multi-use path, closed for gas work. Southbound curb lane will be open for morning and afternoon rush hours.
Ravelston Av W to El Tassi Dr
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Southbound curb lane, southbound protected bike lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Adamar Rd to Chancellor Dr
Expected Duration: 12 May 2025 - 28 Nov 2025
Reconstruction of Pembina Hwy & Abinojii Mikanah. Multiple lanes closed. West sidewalk and Southbound Painted bike lane closed. Follow detours. Sat, May 24 - Sun, May 25: Intermittent (<10 Mins) complete closure of all lanes from 12AM-6AM for overhead work.
Adamar Rd to Manahan Av
Expected Duration: 01 Jul 2025 - 09 Jul 2025
Northbound curb lane, northbound painted bike lane, east side sidewalk, closed for landscaping/tree maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Calrossie Bv to Merriam Bv
Expected Duration: 02 Jul 2025 - 09 Jul 2025
Northbound curb lane, northbound painted bike lane, east side sidewalk, closed for street construction/maintenance.
Calrossie Bv to Merriam Bv
Expected Duration: 23 Jun 2025 - 25 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Grandmont Bv to Ducharme Av
Expected Duration: 24 Jun 2025 - 30 Jul 2025
Southbound median lane, closed for street construction/maintenance.
Grandmont Bv to Ducharme Av
Expected Duration: 16 Jun 2025 - 04 Jul 2025
Southbound curb lane, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Greencrest Av to Dalhousie Dr
Expected Duration: 02 Jul 2025 - 02 Jul 2025
East side sidewalk, closed for street construction/maintenance.
Newdale Av to De Vos Rd
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Southbound curb lane, southbound painted bike lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Pembina Hw LaSalle River Bridge to Perreault Av
Expected Duration: 12 May 2025 - 17 Oct 2025
Northbound median lane, southbound median lane, closed for street construction/maintenance. Width Restriction: 3.7m, northbound overwidth detour via PR210 to PTH59, southbound overwidth detour via PTH100
Turnbull Dr to De Leglise Av
Expected Duration: 28 Apr 2025 - 08 Aug 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Width Restriction: 3.7m, northbound overwidth detour via PR210 to PTH59
Pembina Hw to Abinojii Mikanah
Expected Duration: 30 Jun 2025 - 10 Aug 2025
Southbound Pembina Hwy to Westbound Abinojii Mikanah Ramp closed for street construction/maintenance. Follow detour.
Verbena St to Viola St
Expected Duration: 11 Jun 2025 - 18 Jul 2025
At Riverwest Rd
Expected Duration: 26 Jun 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Gilia Dr to Buttercup Av
Expected Duration: 11 Jun 2025 - 18 Jul 2025
Camiel Sys St to Dugald Rd
Expected Duration: 12 May 2025 - 22 Aug 2025
Northbound curb lane, closed for street construction/maintenance.
Kildonan Meadow Dr to Kildare Av W
Expected Duration: 08 Jul 2025 - 08 Jul 2025
Northbound median lane, southbound median lane, closed for street construction/maintenance. Northbound median lane will be open for morning and afternoon rush hours. Southbound median lane will be open for morning and afternoon rush hours.
Inkster Bv to Church Av
Expected Duration: 27 May 2025 - 09 Oct 2025
Northbound curb lane, closed for film production or special event/festival.
Somerville Av to Somerset Av
Expected Duration: 27 May 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Main St to St Cross St
Expected Duration: 01 Jun 2025 - 21 Jul 2025
Eastbound curb lane, closed for water work.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Arlington St to Wall St
Expected Duration: 02 Jul 2025 - 18 Jul 2025
Westbound middle lane 2, westbound middle lane, closed for sewer work.
Aubrey St to Lipton St
Expected Duration: 07 Jan 2025 - 08 Jan 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Balmoral St to St Mary Av
Expected Duration: 27 Jun 2025 - 27 Jun 2025
Eastbound curb lane, closed for loading/unloading.
Burnell St to Lipton St
Expected Duration: 20 Jun 2025 - 14 Jul 2025
Westbound median lane, south side sidewalk, closed for electrical/lighting/signals work. Westbound median lane will be open for morning and afternoon rush hours.
Carlton St to Donald St
Expected Duration: 26 Jun 2025 - 21 Jul 2025
Eastbound curb lane, westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Carlton St to Vaughan St
Expected Duration: 14 Jul 2025 09:00 a.m. - 17 Jul 2025 03:00 p.m.
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, north side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours. Only one lane in each direction to be closed at a time.
Conway St to Moorgate St
Expected Duration: 12 Jun 2025 - 07 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
David St to Muriel St
Expected Duration: 12 May 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Duffield St to Moorgate St
Expected Duration: 25 Jun 2025 - 04 Jul 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Fort St to Main St
Expected Duration: 02 Jul 2025 - 17 Oct 2025
South side sidewalk, closed for building construction/maintenance.
Fort St to Main St
Expected Duration: 04 Dec 2024 - 01 Jul 2025
Pedestrian Effect: February 1979 – Thu, June 26, 2025: Sidewalk crossings closed. Fri, June 27: After 45 years, the winds of change have swept through Canada’s windiest corner—Portage & Main reopens to pedestrians! Step back into the heart of the city—and into a piece of Winnipeg history. Vehicle Effect: Wed, June 18 – Thu, June 26: Westbound & Eastbound curb lanes closed. Fri, June 27: Construction’s complete, but the corner’s busier—pedestrians are back at Portage & Main. Drive with care!
Garry St to Fort St
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Back lane/public lane, closed for communications work.
Hargrave St to Carlton St
Expected Duration: 12 May 2025 - 31 Jul 2025
Westbound curb lane, westbound shoulder lane, north side sidewalk, closed for building construction/maintenance.
Hargrave St to Carlton St
Expected Duration: 17 Jun 2025 - 18 Jun 2025
Westbound median lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound median lane will be open for morning rush hour.
Kennedy St to Vaughan St
Expected Duration: 24 Jun 2025 - 25 Jul 2025
Westbound curb lane, westbound right turn (yield) lane, partial north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Kintyre St to Davidson St
Expected Duration: 02 Jul 2025 - 24 Jul 2025
Westbound median lane, westbound middle lane 2, closed for communications work. Westbound median lane will be open for morning and afternoon rush hours. Westbound middle lane 2 will be open for morning and afternoon rush hours.
Lenore St to Arlington St
Expected Duration: 01 Jul 2025 - 04 Jul 2025
Eastbound curb lane, westbound curb lane, closed for water work. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Marjorie St to Parkview St
Expected Duration: 08 May 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
McGee St to Huntleigh St
Expected Duration: 29 Jul 2020 - 30 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Moorgate St to Sharp Bv
Expected Duration: 07 Mar 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Mount Royal Cr to Moorgate St
Expected Duration: 07 Jul 2025 - 31 Mar 2026
Eastbound curb lane, closed for sewer work.
Strathcona St to Empress St
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Westbound middle lane, westbound curb lane, closed for building construction/maintenance. Westbound middle lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Sumach St to Rouge Rd
Expected Duration: 07 Jul 2025 - 21 Jul 2025
Eastbound curb lane, south side sidewalk, closed for loading/unloading. Eastbound curb lane will be open for morning and afternoon rush hours.
Traill Av to Strathmillan Rd
Expected Duration: 06 Jun 2025 - 30 Jun 2025
Eastbound median lane, westbound curb lane, westbound median lane, closed for water work. Eastbound median lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours. Westbound median lane will be open for morning and afternoon rush hours.
Tylehurst St to Empress St
Expected Duration: 13 Jun 2025 - 14 Jul 2025
Westbound median lane, closed for sewer work.
Woodlands Cr to Harris Bv
Expected Duration: 03 Jun 2025 - 27 Jun 2025
Eastbound curb lane, eastbound middle lane, eastbound middle lane 2, eastbound median lane, closed for water work. Two eastbound lanes will remain open at all times.
Main St to Westbrook St
Expected Duration: 26 Jul 2024 - 22 May 2026
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
Main St to Westbrook St
Expected Duration: 15 Oct 2024 - 26 Aug 2025
South side sidewalk, closed for loading/unloading.
Westbrook St to Main St
Expected Duration: 10 Dec 2024 - 01 Jul 2025
Pedestrian Effect: February 1979 – Thu, June 26, 2025: Sidewalk crossings closed. Fri, June 27: After 45 years, the winds of change have swept through Canada’s windiest corner—Portage & Main reopens to pedestrians! Step back into the heart of the city—and into a piece of Winnipeg history. Vehicle Effect: Wed, June 18 – Thu, June 26: Westbound & Eastbound curb lanes closed. Fri, June 27: Construction’s complete, but the corner’s busier—pedestrians are back at Portage & Main. Drive with care!
Century St to Portage Av
Expected Duration: 05 Jul 2025 - 06 Jul 2025
Westbound Portage Ave Exit Ramp to Southbound Century St (Route 90) closed for street construction/maintenance. Exit ramp to be open for all peak hours.
Neepawa St to St Marys Rd
Expected Duration: 19 Jun 2025 - 08 Jul 2025
Westbound curb lane, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Taylor Av to Cambridge St
Expected Duration: 09 Jun 2025 - 29 Aug 2025
All northbound lanes, closed for sewer work.
At Flora Av
Expected Duration: 30 Jun 2025 - 31 Jan 2026
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Atlantic Av to Bannerman Av
Expected Duration: 17 May 2025 - 14 Jul 2025
All southbound lanes, all northbound lanes, closed for sewer work.
Kingsbury Av to Royal Av
Expected Duration: 28 Apr 2025 - 04 Jul 2025
Northbound curb lane, closed for sewer work.
Semple Av to Kilbride Av
Expected Duration: 31 Jan 2025 - 04 Jul 2025
Southbound curb lane, closed for sewer work.
At Millpond Pa
Expected Duration: 30 Jun 2025 - 07 Jul 2025
Southbound curb lane, closed for loading/unloading.
James Av to William Av
Expected Duration: 23 Feb 2024 - 16 Jul 2025
East side sidewalk, closed for building construction/maintenance.
McDermot Av to Notre Dame Av
Expected Duration: 01 Jul 2025 - 05 Aug 2025
East side sidewalk, closed for building construction/maintenance.
McDermot Av to Notre Dame Av
Expected Duration: 23 Jun 2025 - 04 Jul 2025
East side sidewalk, closed for building construction/maintenance.
William Av to Notre Dame Av
Expected Duration: 12 Jul 2025 - 12 Jul 2025
All southbound lanes, west side sidewalk, closed for film production or special event/festival.
McGregor St to McKenzie St
Expected Duration: 25 Jun 2025 - 21 Jul 2025
Back lane/public lane, closed for communications work.
Waterfront Dr to Tache Av
Expected Duration: 06 Jul 2025 - 06 Jul 2025
All eastbound lanes, closed for electrical/lighting/signals work. All eastbound lanes will be open for morning and afternoon rush hours.
Waterfront Dr to Tache Av
Expected Duration: 17 Jun 2025 - 18 Jun 2025
Eastbound median lane, westbound median lane, closed for electrical/lighting/signals work. Eastbound median lane will be open for morning and afternoon rush hours. Westbound median lane will be open for morning and afternoon rush hours.
Aulneau St to St Joseph St
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Des Meurons to Archibald St
Expected Duration: 11 Mar 2025 - 14 Mar 2025
Eastbound median lane, eastbound curb lane, south side sidewalk, closed for sewer work. Only one eastbound lane to be closed at a time. Eastbound median lane and Eastbound curb lane will be open for morning and afternoon rush hours.
La Fleche St to Archibald St
Expected Duration: 19 Jun 2025 - 21 Jul 2025
Eastbound middle lane (Second Left Turn Lane from Median), south side sidewalk, closed for sewer work. Eastbound middle lane will be open for morning and afternoon rush hours.
St Joseph St to Langevin St
Expected Duration: 03 Jun 2025 - 30 Jun 2025
Alternating closure of an Eastbound lane and the backlane closed for electrical/lighting/signals work. All lanes open for peak hours.
Tache Av to Langevin St
Expected Duration: 12 May 2025 - 27 Jun 2025
Westbound curb lane, eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for afternoon rush hour.
Tache Av to St Joseph St
Expected Duration: 02 Jan 2024 - 30 May 2025
South side sidewalk, closed for street construction/maintenance.
Norwood Bridge to Main Street Bridge
Expected Duration: 24 May 2025 - 27 Jun 2025
Northbound middle lane, northbound middle lane 2, closed for water work.
Mathers Av to Brock St
Expected Duration: 24 Jun 2025 - 31 Jul 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for sewer work.
Winona St to Bond St
Expected Duration: 14 May 2025 - 27 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for sewer work.
Art Miki Wy to Peguis St
Expected Duration: 23 Jun 2025 - 21 Jul 2025
Westbound curb lane, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Main St to Salter St
Expected Duration: 02 Jul 2025 - 18 Jul 2025
All eastbound lanes, south side sidewalk, closed for street construction/maintenance.
Owen St to Bradley St
Expected Duration: 17 Jun 2025 - 14 Jul 2025
Eastbound curb lane, closed for gas work.
Stapon Rd to Lagimodiere Bv
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Eastbound curb lane, westbound curb lane, closed for water work. Westbound curb lane will be open for morning and afternoon rush hours.
Parade Dr to Harold Av E
Expected Duration: 26 Jun 2025 - 29 Jun 2025
Southbound curb lane, closed for loading/unloading.
Main St to Scotia St
Expected Duration: 12 Jun 2025 - 11 Jul 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Jaymorr Dr to Fairway Pl
Expected Duration: 26 Mar 2025 - 27 Mar 2025
All southbound lanes, all northbound lanes, closed for sewer work.
St Marys Rd to Glen Meadow St
Expected Duration: 21 Feb 2025 - 28 Feb 2025
Westbound curb lane, closed for building construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Tache Av to End
Expected Duration: 16 Jun 2025 - 07 Jul 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
At Arctic St
Expected Duration: 17 Jun 2025 - 19 Dec 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
At McNulty Cr
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Sutherland Av to Jarvis Av
Expected Duration: 26 May 2025 - 18 Jul 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 01 Nov 2024 - 31 Aug 2025
East side sidewalk, closed for building construction/maintenance.
Lombard Av to McDermot Av
Expected Duration: 09 Jul 2025 - 14 Jul 2025
Northbound curb lane, southbound curb lane, closed for film production or special event/festival.
Portage Av to Ness Av
Expected Duration: 15 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Cockburn St S to Daly St S
Expected Duration: 01 Jul 2025 - 01 Jul 2025
All eastbound lanes, all westbound lanes, closed for block party.
Daly St S to Cockburn St S
Expected Duration: 24 May 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Rockman St to Derek St
Expected Duration: 03 Jul 2025 - 03 Jul 2025
Westbound curb lane, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Bryce St to End
Expected Duration: 16 Jun 2025 - 11 Jul 2025
All eastbound lanes, closed for sewer work. No access to Bryce St. Local traffic maintained.
Bryce St to Osborne St
Expected Duration: 16 Jun 2025 - 30 Nov 2025
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Paulin St to Ellen St
Expected Duration: 27 Jun 2025 - 31 Dec 2025
North side sidewalk, closed for building construction/maintenance.
Sherbrook St to Tecumseh St
Expected Duration: 01 Jun 2025 - 07 Jul 2025
Westbound curb lane, closed for water work.
Keewatin St to Worth St
Expected Duration: 07 Feb 2025 - 28 Feb 2025
Westbound curb lane, closed for loading/unloading.
Browning Bv to Ericsson By
Expected Duration: 02 Jul 2025 - 11 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Portage Av to Westminster Av
Expected Duration: 19 Dec 2024 - 09 Jul 2025
Southbound curb lane, closed for loading/unloading.
Preston Av to Portage Av
Expected Duration: 20 Jun 2025 - 14 Jul 2025
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
At Snowdon Av
Expected Duration: 12 May 2025 - 01 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
Main St to Lily St
Expected Duration: 22 Aug 2024 - 29 Aug 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
Ness Av to Silver Av
Expected Duration: 26 Jun 2025 - 28 Jun 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for sewer work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Des Hivernants Bv to Blue Sun Dr
Expected Duration: 21 Sep 2023 - 01 Jul 2025
North side sidewalk, closed for building construction/maintenance.
Magnus Av to Alfred Av
Expected Duration: 11 Jun 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours.
Sargent Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Furby St to Langside St
Expected Duration: 06 Jun 2025 - 18 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Milt Stegall Dr to Erin St
Expected Duration: 23 Jun 2025 - 22 Aug 2025
Westbound median lane, all eastbound lanes, south side sidewalk, closed for street construction/maintenance. One westbound lane will be made available at all times.
Newton Av to Armstrong Av
Expected Duration: 16 Jun 2025 - 01 Aug 2025
Northbound curb lane, closed for water work.
At River Av
Expected Duration: 26 May 2025 - 15 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Wardlaw Av to Stradbrook Av
Expected Duration: 11 Jun 2025 - 21 Jul 2025
Back lane/public lane, closed for communications work.
Salter St to Andrews St
Expected Duration: 30 Jun 2025 - 04 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Sgt Tommy Prince St to Van Horne St
Expected Duration: 05 Jul 2025 - 06 Jul 2025
Mill & Fill operations will take place at the intersection of McPhillips St & Selkirk Ave. Complete closure of all Eastbound and Westbound lanes. Use alternate routes.
Powers St to McGregor St
Expected Duration: 06 Jan 2025 - 04 Jul 2025
Westbound curb lane, closed for sewer work.
Ellice Av to Sargent Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Northbound curb lane, northbound painted bike lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Broadway
Expected Duration: 14 Apr 2025 - 30 Sep 2025
Northbound curb lane, back lane/public lane, northbound painted bike lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 13 Jan 2025 - 30 Jul 2025
West side sidewalk, closed for building construction/maintenance.
Portage Av to Ellice Av
Expected Duration: 14 Jan 2025 - 25 Jul 2025
Northbound median lane, closed for building construction/maintenance. Northbound median lane will be open for morning and afternoon rush hours.
Westminster Av to Sara Av
Expected Duration: 29 Mar 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
St Matthews Av to Ellice Av
Expected Duration: 02 Jul 2025 - 07 Jul 2025
Northbound curb lane, east side sidewalk, west side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
Wolever Av to Westminster Av
Expected Duration: 02 Jul 2025 - 18 Jul 2025
Only right-turns permitted from Sherburn St onto Portage Ave. East side crosswalk and west side crosswalk, closed for sewer work. Only one side crosswalk to be closed at a time.
Alexander Av to Logan Av
Expected Duration: 03 Jun 2025 - 07 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
At Notre Dame Av
Expected Duration: 14 Jul 2025 - 08 Aug 2025
Northbound curb lane, southbound curb lane, west side multi-use path, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Hampton St to Berry St
Expected Duration: 08 Jul 2025 - 25 Jul 2025
Westbound curb lane, eastbound curb lane, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours. Eastbound curb lane will be open for morning and afternoon rush hours.
Besant St to Grey St
Expected Duration: 03 Jul 2025 - 25 Jul 2025
All westbound lanes, south side sidewalk, closed for water work.
Louelda St to Besant St
Expected Duration: 30 May 2025 - 26 Oct 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for street construction/maintenance.
Lansdowne Av to Inkster Bv
Expected Duration: 14 May 2025 - 15 Aug 2025
All lanes and sidewalks, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
At Ellice Av
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Back lane/public lane, northbound median lane, west side sidewalk, closed for film production or special event/festival.
At Ellice Av
Expected Duration: 01 May 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Navy Wy to Broadway
Expected Duration: 30 Jun 2025 - 21 Jul 2025
Northbound curb lane, back lane/public lane, east side sidewalk, closed for street construction/maintenance.
Portage Av to Ellice Av
Expected Duration: 10 Jul 2025 - 10 Jul 2025
Northbound middle lane, northbound median lane, west side sidewalk, closed for building construction/maintenance. Northbound middle lane will be open for morning and afternoon rush hours. Northbound median lane will be open for morning and afternoon rush hours.
End to Markham Rd
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Northbound curb lane, closed for film production or special event/festival.
End to Markham Rd
Expected Duration: 09 Jul 2025 - 11 Jul 2025
Northbound curb lane, closed for film production or special event/festival.
End to Markham Rd
Expected Duration: 16 Jun 2025 - 15 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Treger By to Molson St
Expected Duration: 12 May 2025 - 01 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. At least one lane to remain open for local access.
Wicklow St to Point Rd
Expected Duration: 27 May 2025 - 30 Jun 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance.
Aikins St to Salter St
Expected Duration: 19 Jun 2025 - 29 Aug 2025
Eastbound curb lane, closed for water work.
Elizabeth Rd to Baudoux Pl
Expected Duration: 14 Apr 2025 - 31 Oct 2025
Patio installed on the worth sidewalk; pedestrian access remains open.
Lagimodiere Bv to Cox Bv
Expected Duration: 26 Aug 2024 - 22 Nov 2024
Eastbound curb lane, closed for street construction/maintenance.
Dauphin Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Inman Av to St Marys Rd
Expected Duration: 08 May 2025 - 17 Oct 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance.
Worthington Av to Hindley Av
Expected Duration: 28 May 2025 09:00 a.m. - 07 Jul 2025 03:00 p.m.
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Main St to Jones St
Expected Duration: 29 Jun 2025 - 29 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Sargent Av to Ellice Av
Expected Duration: 02 Jul 2025 - 02 Jul 2025
Southbound curb lane, west side sidewalk, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
St James St Crossing of Omands Creek to Notre Dame Av
Expected Duration: 30 Jun 2025 - 01 Aug 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Fermor Av to Hull Av
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Carlton St to Edmonton St
Expected Duration: 09 Jul 2018 - 01 Sep 2025
Westbound curb lane, westbound painted bike lane, north side sidewalk, closed for building construction/maintenance.
Main St to Fort St
Expected Duration: 16 Jun 2025 - 07 Jul 2025
Westbound median lane, back lane/public lane, closed for gas work. Westbound median lane will be open for morning and afternoon rush hours.
Smith St to Donald St
Expected Duration: 10 Oct 2024 - 01 May 2026
Westbound median lane, south side sidewalk, closed for building construction/maintenance.
At Redview Dr
Expected Duration: 09 Jun 2025 - 11 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Britannica Rd to Normand Park Dr
Expected Duration: 10 Feb 2025 - 01 Nov 2025
Southbound curb lane, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Cromwell St to Ferndale Av
Expected Duration: 26 May 2025 - 31 Jul 2025
Southbound curb lane, southbound middle lane, west side sidewalk, closed for street construction/maintenance. Southbound middle lane will be open for morning and afternoon rush hours.
Frederick Av to Thorndale Av
Expected Duration: 23 Jun 2025 - 04 Jul 2025
Northbound median lane, closed for street construction/maintenance.
Frederick Av to Thorndale Av
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Guay Av to Carriere Av
Expected Duration: 31 May 2025 - 14 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Havelock Av to Portland Av
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Mager Dr E to Harrowby Av
Expected Duration: 08 May 2025 - 17 Oct 2025
Northbound curb lane, northbound middle lane, southbound left turn storage lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Northbound middle lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours. One sidewalk to remain accessible at all times.
Riel Av to St Michael Rd
Expected Duration: 02 Jul 2025 - 01 Aug 2025
Southbound shoulder lane, northbound shoulder lane, closed for street construction/maintenance. Northbound shoulder lane will be open for morning and afternoon rush hours.
St Vital Rd to Barrington Av
Expected Duration: 30 Jun 2025 - 21 Jul 2025
Southbound curb lane, closed for sewer work.
West Fernwood Av to Glenview Av
Expected Duration: 19 Jun 2025 - 27 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
Maryland St to Agnes St
Expected Duration: 09 Jun 2025 - 03 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Tod Dr to Pulberry St
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Nairn Av to McCalman Av
Expected Duration: 13 May 2025 - 30 Jun 2025
East side sidewalk, closed for building construction/maintenance.
McKenzie St to Parr St
Expected Duration: 13 Jun 2025 - 04 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work.
Portage Av to Wolseley Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Portage Av to Wolseley Av
Expected Duration: 03 Jun 2025 - 27 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Osborne St to Donald St
Expected Duration: 25 Jun 2025 - 25 Jun 2025
Eastbound median lane, north side sidewalk, closed for landscaping/tree maintenance. Eastbound median lane will be open for morning and afternoon rush hours.
Ellice Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Sturgeon Rd to Centreport Canada Wy
Expected Duration: 06 Jan 2025 - 29 Aug 2025
Northbound curb lane, closed for sewer work.
Emerald Grove Dr to Ness Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Northbound shoulder lane, east side sidewalk, closed for street construction/maintenance.
Sturgeon Rd Crossing of Sturgeon Creek to Portage Av
Expected Duration: 03 Jun 2025 - 27 Jun 2025
Southbound left turn storage lane, closed for water work.
Tonka Point to Saskatchewan Av
Expected Duration: 23 Jun 2025 - 07 Jul 2025
All northbound lanes, all southbound lanes, closed for sewer work.
Tonka Point to Sturgeon Rd Crossing of Sturgeon Creek
Expected Duration: 23 Jan 2025 - 29 Aug 2025
Southbound right turn (yield) lane, closed for sewer work.
Tonka Point to Sturgeon Rd Crossing of Sturgeon Creek
Expected Duration: 24 Mar 2025 - 25 Jul 2025
Northbound shoulder lane, closed for water work. Northbound shoulder lane will be open for morning and afternoon rush hours.
De La Seigneurie Bv to Desjardins Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Disraeli St to Euclid Av
Expected Duration: 19 Jun 2025 - 14 Jul 2025
Westbound curb lane, closed for electrical/lighting/signals work.
Goulet St to Dollard Bv
Expected Duration: 16 Jun 2025 - 14 Jul 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Horace St to Kitson St
Expected Duration: 01 Jul 2025 - 21 Jul 2025
Northbound curb lane, southbound median lane, closed for water work. A median crossover will occur to always allow one northbound and one southbound travel lane at all times.
Marion St to Horace St
Expected Duration: 25 Mar 2025 - 31 Oct 2025
Patio installed on the Northbound curb lane; pedestrian access remains open.
At Lakewood Bv
Expected Duration: 07 Jul 2025 - 11 Jul 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Allan St to Watt St
Expected Duration: 13 Jun 2025 - 07 Jul 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Centennial St to Lindsay St
Expected Duration: 26 Jun 2025 - 25 Jul 2025
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Only one lane in each direction to be closed at a time. Only one sidewalk to be closed at a time.
Poseidon By to Wilton St
Expected Duration: 12 May 2025 - 12 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 09 Sep 2024 - 30 Sep 2025
East side sidewalk, closed for building construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 02 Jul 2025 - 02 Jul 2025
All southbound lanes, all northbound lanes, closed for loading/unloading.
Bannatyne Av to McDermot Av
Expected Duration: 14 Jul 2025 - 14 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 23 Jun 2025 - 23 Jun 2025
All southbound lanes, all northbound lanes, closed for loading/unloading.
McDermot Av to Bannatyne Av
Expected Duration: 20 Jun 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for building construction/maintenance.
McDermot Av to Bannatyne Av
Expected Duration: 30 May 2025 - 30 May 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for building construction/maintenance.
McDermot Av to Bannatyne Av
Expected Duration: 27 Jun 2025 - 27 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for building construction/maintenance.
Cartesian Gt to Daylan Marshall Gt
Expected Duration: 01 Jul 2025 - 15 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Daylan Marshall Gt to McPhillips St
Expected Duration: 28 May 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for communications work. Eastbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Nightingale Rd
Expected Duration: 17 Apr 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
St David Rd to St Marys Rd
Expected Duration: 07 Jul 2025 - 11 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Hovingham St to Rushmore Rd
Expected Duration: 19 Jun 2025 - 18 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
At St Vital Rd
Expected Duration: 18 Jun 2025 - 08 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Samantha Pl to Farlinger By
Expected Duration: 04 Jun 2025 - 30 Jun 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance.
Dafoe Rd to Markham Rd
Expected Duration: 01 Jul 2025 - 01 Jul 2025
Road will be open, but permit allows for Bomber team to control ingress & egress. All repurposing plans made in coordination with Public Works Traffic Services.
Dafoe Rd to Markham Rd
Expected Duration: 09 Jul 2025 - 11 Jul 2025
Road will be open, but permit allows for Bomber team to control ingress & egress. All repurposing plans made in coordination with Public Works Traffic Services.
Dysart Rd to Thatcher Dr
Expected Duration: 21 Apr 2025 - 04 Jul 2025
All northbound lanes, east sidewalk closed for street construction/maintenance. Median Crossover to provide 1 NB & 1 SB travel lanes.
Bridge Lake Dr to Cherrywood Rd
Expected Duration: 04 Jul 2025 - 04 Jul 2025
All southbound lanes, all northbound lanes, closed for landscaping/tree maintenance. All southbound lanes will be open for morning and afternoon rush hours. All northbound lanes will be open for morning and afternoon rush hours.
Ellice Av to Wellington Av
Expected Duration: 23 Jun 2025 - 26 Sep 2025
Portage Av to St Mary Av
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Gilia Dr to Buttercup Av
Expected Duration: 11 Jun 2025 - 18 Jul 2025
Delmar St to Victoria Rw
Expected Duration: 01 Jul 2025 - 21 Jul 2025
All eastbound lanes, all westbound lanes, closed for water work. Local traffic to be maintained.
Arrowwood Dr N to Canna Bv
Expected Duration: 03 Jun 2025 - 08 Jul 2025
Northbound curb lane, closed for sewer work.
Pandora Av E to Regent Av E
Expected Duration: 12 May 2025 - 31 Jul 2025
Northbound curb lane, southbound curb lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance. One sidewalk to remain open at all times.
Donnelly St to Marshall Cr
Expected Duration: 20 May 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
At Bonaventure Dr W
Expected Duration: 12 Jul 2025 - 12 Jul 2025
All eastbound lanes, all westbound lanes, closed for block party.
Osborne St to Scott St
Expected Duration: 17 Mar 2025 - 30 Apr 2025
South side sidewalk, closed for building construction/maintenance.
At Bridge Lake Dr
Expected Duration: 01 Jul 2025 - 01 Jul 2025
All eastbound lanes and westbound lanes closed for the Bridgwater Canada Day Celebration.
Pembina Hw to Wicklow St
Expected Duration: 05 May 2025 - 31 Jul 2025
Temporary accessible parking spot installed in the Eastbound curb lane during reconstruction of Wicklow St.
Bannatyne Av to James Av
Expected Duration: 30 Mar 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Pioneer Av to Lombard Av
Expected Duration: 11 Jul 2025 05:00 p.m. - 11 Jul 2025 11:00 p.m.
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Thames Av to Chalmers Av
Expected Duration: 06 Oct 2023 - 31 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Thames Av to Chalmers Av
Expected Duration: 23 Aug 2023 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for loading/unloading. Lanes will be open for morning and afternoon rush hours.
Chevrier Bv to McGillivray Bv
Expected Duration: 07 Jul 2025 - 21 Jul 2025
All northbound lanes closed for street construction/maintenance. Only one northbound lane to be closed at a time. All Northbound lanes will be open for morning rush hour.
Chevrier Bv to Scurfield Bv
Expected Duration: 24 May 2025 - 04 Jul 2025
Northbound curb lane, closed for sewer work.
Clarence Av to Chevrier Bv
Expected Duration: 25 Jun 2025 - 21 Jul 2025
Southbound curb lane, closed for sewer work.
Kenaston Bv to Eaglewood Dr
Expected Duration: 06 May 2025 - 30 Jun 2025
Eastbound shoulder lane, westbound shoulder lane, south side sidewalk, north side sidewalk, closed for street construction/maintenance. All lanes to be open for peak hours. Only one sidewalk to be closed at a time.
Erin St to Wall St
Expected Duration: 23 Jun 2025 - 14 Jul 2025
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Strathcona St to Burnell St
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Blanchard Av to Middle Gate
Expected Duration: 02 Jun 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Cornish Av to Middle Gate
Expected Duration: 31 May 2025 - 28 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
At Dale Bv
Expected Duration: 20 Jun 2025 - 22 Aug 2025
All lanes closed for street construction/maintenance. One lane will remain open for local access.
McDowell Dr to Oakdale Dr
Expected Duration: 16 Jun 2025 - 31 Jul 2025
Eastbound median lane, closed for street construction/maintenance.
Maryland St to Sherbrook St
Expected Duration: 30 Jun 2025 - 21 Jul 2025
All eastbound lanes, closed for street construction/maintenance.
At Cottonwood Rd
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Day St to Leola St
Expected Duration: 07 Jul 2025 - 11 Jul 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Dowker Av to End
Expected Duration: 30 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Dowker Av to Waterford Av
Expected Duration: 14 May 2025 - 31 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Waterford Av to Somerset Av
Expected Duration: 12 May 2025 - 22 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
End to Lansdowne Av
Expected Duration: 02 Jun 2025 - 15 Aug 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Sherbrook St to Tecumseh St
Expected Duration: 11 Jul 2025 - 12 Jul 2025
All westbound lanes, eastbound median lane, north side sidewalk, closed for building construction/maintenance.
Tecumseh St to Sherbrook St
Expected Duration: 10 Mar 2025 - 10 Mar 2025
Eastbound curb lane, south side sidewalk, closed for loading/unloading. Eastbound curb lane will be open for morning and afternoon rush hours.
Roblin Bv to Grant Av
Expected Duration: 20 May 2025 - 04 Jul 2025
Southbound right turn (yield) lane, closed for street construction/maintenance.
Pebble Beach Rd to Willowlake Cr
Expected Duration: 02 Jul 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Dominion St to Greenwood Pl
Expected Duration: 11 Apr 2025 - 11 Jul 2025
Westbound curb lane, back lane/public lane, closed for sewer work.
Elgin Av W to Ross Av W
Expected Duration: 24 Jun 2025 - 01 Aug 2025
St Annes Rd to St George Rd
Expected Duration: 19 Jun 2025 - 10 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Ainsdale Wy to Baxter By
Expected Duration: 20 May 2025 - 31 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Pacific Av to Alexander Av
Expected Duration: 17 Jun 2025 - 31 Aug 2025
Northbound curb lane, closed for water work.
Roanoke St to Leola St
Expected Duration: 24 Jun 2025 - 04 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
Smith St to Fort St
Expected Duration: 25 Jun 2025 - 14 Jul 2025
Eastbound median lane, eastbound middle lane 2, closed for street construction/maintenance.
Ellice Av to Portage Av
Expected Duration: 08 Dec 2022 - 30 Nov 2024
Northbound median lane, west side sidewalk, closed for building construction/maintenance.
Ellice Av to Sargent Av
Expected Duration: 20 Jun 2025 - 21 Nov 2025
Southbound curb lane, closed for loading/unloading.