Nitrification Study Conceptual Design Report - November, 2002
Report cover
(pdf - 57kb)
Report table of contents
(pdf - 208kb)
Part I - Introduction and planning framework
- Section 1.0 - Introduction
(pdf - 141kb)
- Section 2.0 - Planning approach
(pdf - 2,478kb)
- Section 1.0 - Introduction
Part II - First priority control alternatives
- Section 3.0 - First priority control alternatives
(pdf - 80kb)
- Section 4.0 - Best practicable level of control
(pdf - 3,364kb)
- Section 5.0 - Optimization of existing plants
(pdf - 286kb)
- Section 6.0 - NEWPCC centrate treatment
(pdf - 1,873kb)
- Section 3.0 - First priority control alternatives
Part III - Second priority control alternatives
- Section 7.0 - Rationale for selecting second priority control alternatives
(pdf - 77kb)
- Section 8.0 - NEWPCC - Second priority control alternatives
(pdf - 2,526kb)
- Section 9.0 - SEWPCC - Second priority control alternatives
(pdf - 1,903kb)
- Section 10. - WEWPCC - Second priority control alternatives
(pdf - 174kb)
- Section 7.0 - Rationale for selecting second priority control alternatives
Part IV - Wet weather impacts
- Section 11. - Wet weather impacts
(pdf - 1,341kb)
- Section 11. - Wet weather impacts
Part V - Nutrient removal
- Section 12.0 - Nutrient removal
(pdf - 56kb)
- Section 13.0 - Chemical phosphorus removal alternatives
(pdf - 1,221kb)
- Section 14.0 - Biological nutrient removal
(pdf - 1,346kb)
- Section 12.0 - Nutrient removal
Part VI - Summary of conceptual cost estimates
- Section 15.0 - Summary of conceptual cost estimates
(pdf - 130kb)
- Section 15.0 - Summary of conceptual cost estimates
Appendix A - Cost estimates
(pdf - 2,064kb)
Conceptual drawings
(pdf - 2,287kb)
Last updated: June 29, 2018