St. Mary's Road is an important truck, Transit, and commuter route. We will renew the road in 2026.
- Background
- Documents
- FAQs
- Map
Background
St. Mary's Road is an important truck, Transit, and commuter route. We will renew the road in 2026.
The goal of this work is to fix the road and improve safety. We will:
- Improve the roadway from northbound St. Mary's Road from Abinojii Mikanah to Fermor Avenue and southbound St. Mary's Road from Fermor Avenue to Arden Avenue
- We will:
- Remove the existing asphalt and repair the concrete road pavement
- Repair curbs and sidewalks where required
- Construct a new layer of asphalt
- Upgrade pedestrian crossings at Havelock Av/Molgat Av and Lennox Av/Bronstone BV
If you have questions about the project, please contact James Kennedy at James.Kennedy@stantec.com
Documents
| Document Name | Date | Type |
|---|---|---|
| Construction notices posted here when available |
Frequently Asked Questions
We are doing construction to make the road smoother, help it drain better, and extend the life of the pavement. We will remove the existing roadway surface, repair the pavement, and replace the asphalt surface. We will also repair curbs and sidewalks where required.
At Havelock Ave./Molgat Ave. Crossing:
- We will add detectable warning tiles to the existing push button pedestrian crossing with flashing lights
At Lennox Ave./Bronstone Blvd. Crossing:
- We will add detectable warning tiles and realign the existing push button pedestrian crossing with flashing lights
The total budget is $6.351 million. It is part of our annual Capital street renewal program of the City of Winnipeg's Capital Budget.
Construction is scheduled for the spring of 2026 and be completed in the fall of 2026.
We will provide temporary transit stops within the construction area during construction.
We will maintain one lane of traffic in each direction throughout construction.