2011 rivers survey monitoring reports
River monitoring is complete for 2011. The monitoring program will resume in May 2012.
Results reported below show normal background results for the locations sampled.
| Monitoring locationsAssiniboine River Red River | 
- November 29  (pdf - 30kb) (pdf - 30kb)
- November 29 *  (pdf - 27kb) (pdf - 27kb)
- November 22 *  (pdf - 26kb) (pdf - 26kb)
- November 15  (pdf - 27kb) (pdf - 27kb)
- November 15 *  (pdf - 26kb) (pdf - 26kb)
- November 9 *  (pdf - 26kb) (pdf - 26kb)
- November 3  (pdf - 11kb) (pdf - 11kb)
- November 3 *  (pdf - 38kb) (pdf - 38kb)
- October 26  (pdf - 27kb) (pdf - 27kb)
- October 12  (pdf - 27kb) (pdf - 27kb)
- September 28  (pdf - 27kb) (pdf - 27kb)
- September 15  (pdf - 27kb) (pdf - 27kb)
- August 31  (pdf - 27kb) (pdf - 27kb)
- August 17  (pdf - 26kb) (pdf - 26kb)
- August 3  (pdf - 27kb) (pdf - 27kb)
- July 20  (pdf - 27kb) (pdf - 27kb)
- July 6  (pdf - 27kb) (pdf - 27kb)
- June 22  (pdf - 27kb) (pdf - 27kb)
- June 8  (pdf - 27kb) (pdf - 27kb)
- May 25  (pdf - 27kb) (pdf - 27kb)
- May 11  (pdf - 27kb) (pdf - 27kb)
* In response to the South End Water Pollution Control Centre plant upset, we increased our monitoring program on the Red River by:
- adding three additional sampling locations (St. Adolphe Pierre Delorme Bridge, South Perimeter Bridge, Cockburn at Bridge's Drive Inn), and
- increasing our sampling frequency from once every two weeks to once a week.
The results of samples collected during this time suggested that the parameters analyzed were within the expected range.
Last updated: April 15, 2024
	
