Reports on untreated sewage
As requested by the Province of Manitoba, we report on the incidents of untreated sewer release into the environment as a result of a disruption to our wastewater collection system. These events are usually the result of something unanticipated like a water main break or a power outage. When sewer operations are disrupted, the sewage can be released into the environment, which helps protect public health and prevent property damage like basement flooding.
2004
(Reporting started in November, 2004)
Date | Location | Estimated discharge |
Estimated duration |
Cause | Incident details and response |
December 22 | Assiniboine River - Olive land drainage sewer |
Volume unknown. Estimate that small amount of sewage was released into the river. | Duration unknown. Estimate that sewer overflowed for several days. | Partial blockage of wastewater sewer at Olive and Ness |
|
December 10 | Red River - Cockburn sewage pumping station |
2000 litres | 10 minutes | Manitoba Hydro power outage |
|
November 27 | Assiniboine River - Ferry Road lift station |
54,000 litres | 15 minutes | Power disruption |
|
Last updated: May 10, 2024