Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
Public Works

Road construction list

The roadway construction list provides project information in alphabetical order by street name. Project information is available by location in both map and list format.

More information: Lane closures

How to use the construction list

Click on the + beside the project name. A dropdown box will appear with these project details:

  1. type of infrastructure (street, alley, sidewalk, traffic signal, bridge project, pedestrian and cycling path),
  2. type of construction work (reconstruction, rehabilitation, mill & fill, thin bituminous overlay, improvements within the right-of-way)
  3. estimated to start,
  4. estimated to end,
  5. approximate percentage completed:
    • Pre-Construction – Construction phase has not started.
    • 0% – Construction contract is in place, but crews have not mobilized to the site.
    • 5% – Crews have mobilized to the site and construction has just begun.
    • 10% 90% – An approximation of progress; construction is well underway.
    • 95% – Main roadway construction is complete; travelling lanes are open/parking is restored/garbage pickup resumes (depending on the location); minor deficiencies and landscaping (seeding/sod) are likely outstanding.
    • COMPLETE – All construction components of the project are complete. Contractor may return for any follow up or warranty work in the next 1-2 years. Utilities (e.g. street lights) may or may not be complete. Construction may not be complete for other locations in the same contract.
  6. consultant information, and
  7. contractor information.

You can also view projects by street name using the Search box provided. Click "View Map" beside any project name to view in a map.

Note: As construction projects get underway this season the information about start dates and completion dates will be updated to reflect the actual project timeline.

A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z


City of Winnipeg - Public Works Capital Projects
(Last updated on February 8, 2023 @ 8:00 PM)
 
 


Adamar Rd - Pembina Hw/End   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Albina Wy/Raber Rd - Kairistine Ln/Hume St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Darco Enterprises
Document
2022 Preconstruction Notice_Hume Street_Kairistine Lane Alley.pdf
Alexander Av - Main St / Princess St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start October 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Archibald St - Messier St / Doucet St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Archibald St - Plinguet St / Messier St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Beecher Av - Ferrier St / End   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Global Homes
Beechtree Cr - Beliveau Rd / Beliveau Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Beliveau Rd E - Marlene St / St Annes Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 5
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Birchdale Av/Lawndale Av - Conniston St/Lyndale Dr   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Biscayne By - McGillivray Pl / McGillivray Pl   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start October 5, 2022
Estimated to end Spring 2023
Approx. % completed 90
Consultant KGS Group Limited
Contractor Bayview Construction Ltd
Document
2022_Biscayne Bay Construction Deferral.pdf
Bluewater Cr - Cherwell Rd / Cherwell Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Briar Cliff By - Killarney Av / Killarney Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Aug 15, 2022
Estimated to end Spring 2023
Approx. % completed 80
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Briarcliff_Killarney to Killarney_Construction Deferral.pdf
Broadway - Osborne St / Main St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Additional information Click here
Brotman By - John Forsyth Rd / John Forsyth Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Byng Pl/Windermere Av - Riverside Dr/Pembina Hw   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start September 6, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Construction_Backlane_Pembina to Riverside_Deferral.pdf
Chancellor Dr - Augusta Dr / Quincy By   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Aug 29, 2022
Estimated to end Spring 2023
Approx. % completed 50
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Construction Notice_Chancellor_Augusta to Quincy_Deferral.pdf
Cunnington Av - Killarney St / Silverthorne Pl   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Aug 3, 2022
Estimated to end Late August 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Cunnington Avenue.pdf
Cunnington Av - St Marys Rd / Killarney St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Aug 3, 2022
Estimated to end Late August 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Cunnington Avenue.pdf
Dakota St - Beliveau Rd / St Marys Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Dakota St - Bishop Grandin Bv / Beliveau Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Day St - New AT Asphalt Path   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start August 17, 2022
Estimated to end Late September 2022
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Bayview Construction Ltd
Document
2022_Construction Notice_Day Street_Transcona Trail to McMeans Av E_AT Path.pdf
De Leglise Av - Campeau St / Pembina Hw   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2023
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_De Leglise_Campeau to Pembina_Construction Deferral.pdf
Dee St - Logan Av / Alexander Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
Des Meurons St - Goulet St / Marion St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Dunkirk Dr - Dunkirk Dr / Kingston Rw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Dunkirk Dr - St Vital Bridge / Norberry Dr   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Dunkirk Dr - Kingston Rw / Dunkirk Dr   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Dunkirk Dr - Kingston Rw / Dunkirk Dr   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Dunkirk Dr - Kingston Rw / Dunkirk Dr   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Dunkirk Dr - St Vital Rd / St Vital Bridge   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Edderton Av - Derek St / Beaumont St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Edmonton St - Ellice Av / Cumberland Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Ellice Av - Carlton St / Kennedy St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Erin St - Notre Dame Ave / Sargent Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Erin St - Sargent Av / Wolever Ave   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 24,2022
Estimated to end Fall 2023
Approx. % completed 40
Consultant Morrison Hershfield Limited
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2022 Construction Notice_Erin.pdf
Eugenie St - Tache Av / St Marys Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
Fifth Av/Guay Av - Des Meurons St/St Marys Rd   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Gertrude Av Speed Bump Installation   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 22, 2022
Estimated to end Mid September 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Gertrude Ave.pdf
Glenthorne Cr - Greendell Av / Darwin St   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Glenthorne Cr - Woodlawn Av / Greendell Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Goulet St - Braemar Av / Youville St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Grant Av - 150m East of Kenaston / Borebank St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Document
2022 Construction Notice_Grant Ave.pdf
Grant Av - Borebank St / Montrose St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 25, 2022
Estimated to end Fall 2023
Approx. % completed 80
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Document
2022 Construction Notice_Grant Ave.pdf
Grant Avenue Pathway - Chalfont Rd/Assiniboine Forest Path   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start September 1, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Grant Ave Pathway Construction Notice.pdf
Greencrest Av - Ulster St / Pembina Hw   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Horace St - Des Meurons St / Enfield Cr   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 5
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2022_Construction Notice_Horace St.pdf
Horace St - Youville St / Des Meurons St   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 5
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2022_Construction Notice_Horace St.pdf
Inkster Bv - McKenzie St / Arlington St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Jewett By - Sinnott St / Sinnott St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start September 26, 2022
Estimated to end Spring 2023
Approx. % completed 80
Consultant KGS Group Limited
Contractor Bayview Construction Ltd
Document
2022_Jewett Bay Construction Deferral.pdf
John Forsyth Rd - Thornewood Av / Warde Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start July 27, 2022
Estimated to end Mid August 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_John Forsyth.pdf
Johnson Av W - Levis St / Henderson Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Jubilee Av - Cockburn St S / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Jubilee Av - Osborne St / Cockburn St S   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 8, 2022
Estimated to end Fall 2022
Approx. % completed 50
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Additional information Click here
Document
2022 Construction Notice_Jubilee.pdf
Kavanagh St/Giroux St - Dufresne Av/West Concrete Lane Limit   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Keewatin St - Manitoba Av / Selkirk Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 23, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Kingston Rw - Dunkirk Dr / Dunkirk Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
La Grave St - Lemay Av / Lord Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2023
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_La Grave _Lemay to Lord_Construction Deferral.pdf
Lagimodiere Bv - Fermor Av / Cottonwood Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Lakeshore Rd - Chancellor Dr / Chancellor Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2023
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Lakeshore_ Chancellor to Chancellor_Construction Deferral.pdf
Lakeshore Rd - Chancellor Dr / Chancellor Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2023
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Lakeshore_ Chancellor to Chancellor_Construction Deferral.pdf
Lakewood Pathway - Lake Park Dr/Clearwater Rd/Edgewater Dr   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start September 20, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Van Belleghem Park.pdf
Legion Av - King Edward St / Oddy St   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Logan Av - Blake St/Vine St   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Logan Av - Disraeli Fwy / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Lydia St - McDermot Av / Notre Dame Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
Macalester By - Silverstone Av / Silverstone Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Manchester Bv N - Point Rd / End   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
McGregor St - Church Av / Mountain Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
McGregor St - Selkirk Av / Dufferin Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
McGregor St - Seven Oaks Av / McAdam Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
McMeans Av E - Wayoata St / Wabasha St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start October 10, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_McMeans Avenue East.pdf
McMillan Av/Corydon Av/Donald St   View Map
Facility type Street
Type of work Preservation
Estimated to start Early September 2022
Estimated to end Fall 2022
Approx. % completed 50
Document
2022_Construction Notice_Donald Street.pdf
McPhillips St - Machray Av / Mountain Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Document
2022_Construction Advance Notice_McPhillips.pdf
Midland St - Notre Dame Av / Saskatchewan Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM Canada Ltd
Midwinter Av - Stadacona St / 193 Midwinter Ave   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start September 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Minnetonka St - Avalon Rd / River Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start August 22, 2022
Estimated to end Mid September 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022 Construction Notice_Minnetonka St.pdf
Moore Av - Dunkirk Dr / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Aug 9, 2022
Estimated to end Spring 2023
Approx. % completed 0
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Construction Notice_Moore_River to St Marys_Deferral.pdf
Moore Av - Flynn St / Pulberry St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Aug 9, 2022
Estimated to end Spring 2023
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Construction Notice_Moore_River to St Marys_Deferral.pdf
Moore Av - Pulberry St / Dunkirk Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Aug 9, 2022
Estimated to end Spring 2023
Approx. % completed 70
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Construction Notice_Moore_River to St Marys_Deferral.pdf
Moore Av - River Rd / Flynn St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Aug 9, 2022
Estimated to end Spring 2023
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor JC Paving
Document
2022_Construction Notice_Moore_River to St Marys_Deferral.pdf
Mountain Ave - Arlington St / Airlies St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 2022
Estimated to end Fall 2023
Approx. % completed 0
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Document
2022 Construction Notice_Mountain Ave2.pdf
Niakwa Trail Pathway - Lagimodiere Bv/Westmount Dr   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start September 19, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Niakwa Pathway.pdf
Northwest Hydro Corridor Pathway - Church Av to McPhillips Street Casino   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Northwest Hydro Corridor Pathway - Leila Av / Church Av   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start September 14, 2022
Estimated to end Spring 2023
Approx. % completed 80
Consultant City Of Winnipeg - Engineering Division
Contractor Wintec Building Services Inc.
Document
2022_Construction Notice_Northwest Hydro New Multi-Use Pathway.pdf
Notre Dame Av - Arlington St / McPhillips St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start September 5, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Notre Dame Ave.pdf
Notre Dame Av - Dublin Av / Wall St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Aug 20, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Notre Dame St - Langevin St / St Joseph St   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 5
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2022_Construction Notice_Notre Dame.pdf
Oakland Av - Rothesay St / Roch St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start August 15, 2022
Estimated to end Mid September 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Oakland Ave.pdf
Osborne St - Baltimore Rd / Rosedale Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Osborne St - Don Av / Glasgow Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start October 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Osborne St - Rosedale Av / St Vital Bridge   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Osborne St - Stradbrook Av / Wardlaw Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Palmerston Av - Arlington St / Ethelbert St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2022
Estimated to end Fall 2022
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Darco Enterprises
Document
2022 Preconstruction Notice_Palmerston Ave_920 to Wolseley.pdf
Pandora Ave E - Redonda St / Wayoata St   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start July 4, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Bayview Construction Ltd
Additional information Click here
Document
2022 Construction Notice_Pandora Ave_Wayoata St to Redonda St_AT Path.pdf
Pembina Hw - McGillivray Bv / Chevrier Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 9, 2022
Estimated to end Fall 2022
Approx. % completed 50
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Additional information Click here
Document
2022 Construction Notice_Pembina.pdf
Pembina Hw - McGillivray Bv / Chevrier Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Provencher Bv - Tache Av / Langevin St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start August 29, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Provencher Boulevard.pdf
Ravine Dr - River Pointe Dr / Settlers Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Redwood Av - Salter St / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start August 2022
Estimated to end Fall 2023
Approx. % completed 0
Consultant KGS Group Limited
Document
2022 Preconstruction Notice_Redwood Ave.pdf
Reenders Pathway - Stapon Rd/Panet Rd   View Map
Facility type Pedestrian / Cycling
Type of work New Facility
Estimated to start September 26, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Reenders Dr.pdf
Renfrew St - Grant Av / Taylor Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 29, 2022
Estimated to end Spring 2023
Approx. % completed 80
Consultant KGS Group Limited
Contractor Bayview Construction Ltd
Document
2022_Renfrew Street Construction Deferral.pdf
RHG Bonney Castle Pathway - Chancellor Dr/Syracuse Cr   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start August 18, 2022
Estimated to end Late September 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022 RHG Bonnycastle School Pathway Notice.pdf
River Av - Osborne St / Wellington Cr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
River Rd - Woodlawn Av / St Marys Rd   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Roblin Bv - Chalfont Rd / William R Clement Pw   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Rossmere Cr - Dunvegan St / Kildonan Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2022
Estimated to end Mid October 2022
Approx. % completed 90
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2022_Construction Notice_Rossmere Cr.pdf
Salter St - Jefferson Av / Inkster Bv   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Document
2022_Construction Advance Notice_Salter.pdf
Sargent Av - Balmoral St / Edmonton St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Sargent Av - Furby St / Balmoral St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Sargent Av/Ellice Av - Clifton St/Spruce St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant WSP Canada Inc.
Contractor Darco Enterprises
Document
2022 Preconstruction Notice_Sargent Avenue_Spruce Street Alley.pdf
Saskatchewan Av - King Edward St / Century St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 18, 2022
Estimated to end Fall 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2022 Construction Notice_Saskatchewan Ave_Sherwin to St James.pdf
Saskatchewan Av - King Edward St / Sherwin Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 18, 2022
Estimated to end Fall 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2022 Construction Notice_Saskatchewan Ave_Sherwin to St James.pdf
Saskatchewan Av - Midland St / Empress St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM Canada Ltd
Saskatchewan Av - St James St / Border St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 18, 2022
Estimated to end Fall 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2022 Construction Notice_Saskatchewan Ave_Sherwin to St James.pdf
Selkirk Av - Main St / Salter St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Document
2023_Advance Construction Notice_Selkirk.pdf
Selkirk Ave - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 2022
Estimated to end Summer 2022
Approx. % completed 90
Consultant Stantec Consulting Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Document
2022 Preconstruction Notice_Selkirk and William.pdf
Silver Av - Sturgeon Rd / Hamilton Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start October 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Smith - Graham Av/Midtown Bridge   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 2022
Estimated to end Fall 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2022 Preconstruction Notice_Smith St.pdf
Smith St - Ellice Av / Portage Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 2022
Estimated to end Fall 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2022 Preconstruction Notice_Smith St.pdf
Smith St - Notre Dame / Ellice Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Smith St - Portage Av / Graham Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 2022
Estimated to end Fall 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2022 Preconstruction Notice_Smith St.pdf
St Annes Rd - Hindley Av/Worthington Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2022
Estimated to end Fall 2023
Approx. % completed 0
Document
2022 Preconstruction Notice_St Annes Rd 475.pdf
St Annes Rd - St Marys Rd / Fermor Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St George Rd - Sadler Av / Hindley Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed Planned
St Vital Bridge   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Stafford St - Scotland Av/Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 2023
Estimated to end Fall 2023
Approx. % completed 10
Consultant Stantec Consulting Ltd
Contractor Nelson River Construction
Additional information Click here
Stradbrook Av - Queen Elizabeth Wy/Harkness St   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Stradbrook Ave - Wellington Cr / Osborne St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Talbot Av - 267 Talbot Av / 168 Talbot Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start September 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Taylor Ave - Harrow St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant Stantec Consulting Ltd
Contractor Nelson River Construction
Additional information Click here
Document
2022 Preconstruction Notice_Taylor Ave.pdf
Tu Pelo Av - London St / West of Jeffrey Cr   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Aug 8, 2022
Estimated to end Early September 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Tu-pelo Ave.pdf
Tu Pelo Av - London St / West of Jeffrey Cr   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Aug 8, 2022
Estimated to end Early September 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Tu-pelo Ave.pdf
Tulane By - Pasadena Av / Pasadena Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2023
Estimated to end Fall 2023
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Asphaltec Paving
University Cr - Pembina Hw / Thatcher Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 18, 2022
Estimated to end Spring 2023
Approx. % completed 70
Consultant AECOM Canada Ltd
Contractor Bituminex Paving Ltd
Document
2022_University Cres_Deferral Notice.pdf
University Cr - Thatcher Dr / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 18, 2022
Estimated to end Spring 2023
Approx. % completed 70
Consultant AECOM Canada Ltd
Contractor Bituminex Paving Ltd
Document
2022_University Cres_Deferral Notice.pdf
Victoria Av E - Roanoke St / Leola St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start September 1, 2022
Estimated to end Fall 2022
Approx. % completed 80
Consultant WSP Canada Inc.
Contractor Bayview Construction Ltd
Document
2022_Construction Notice_Victoria Avenue E.pdf
Wall St - Wellington Av / Notre Dame Ave   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 16,2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2022 Construction Notice_Wall Street.pdf
Waller Av/Clarence Av - Hudson St/Marshall Cr   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2022
Estimated to end Spring 2023
Approx. % completed 0
Consultant KGS Group Limited
Contractor Bayview Construction Ltd
Document
2022_Hudson St Alley Construction Deferral.pdf
Wellington Cr - River Av / Stradbrook Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Weston St - Alexander Av / Pacific Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Streets Maintenance Division
Whellams Ln - Claus By / Appleton St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start August 5, 2022
Estimated to end Late August 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_Whellams Ln.pdf
William Av - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 2022
Estimated to end Fall 2023
Approx. % completed 80
Consultant Stantec Consulting Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Document
2022 Preconstruction Notice_Selkirk and William.pdf
York Av - Main St / Carlton St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start September 19, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_York Ave_Sidewalk.pdf
York Av - Main St / Carlton St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start September 19, 2022
Estimated to end Fall 2022
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
2022_Construction Notice_York Ave_Sidewalk.pdf
Yukon Av - Milt Stegall Dr / St James St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 24, 2022
Estimated to end Late June 2022
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2022 Construction Notice_Yukon_St James to Empress.pdf

Disclaimer and Indemnity:

The information on this web site is provided as a public service and should be used for general information purposes only. Although the information provided represents the planned capital work on city infrastructure for the current year, the City of Winnipeg cannot guarantee that it is accurate or current at all times. Although it is rare that projects are not finished within the stated timeframe, the City cannot guarantee that the work will be completed in all cases.

The information on this web site is subject to change without notice. Winnipeg.ca AND ITS AFFILIATES ARE NOT RESPONSIBLE IN ANY MANNER FOR DIRECT, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES HOWSOEVER CAUSED RESULTING FROM THE USE, MISUSE OR MISINTERPRETATION OF ANY CONTENT, PRODUCTS OR SERVICES PROVIDED BY THIS WEB SITE.

By using this site, you agree to indemnify, defend and hold harmless City of Winnipeg and its officials, officers, employees and authorized representatives from and against any liability, loss injury (including injuries resulting in death), demand, action, cost, expense, or claim of any kind, including but not limited to lawyer's fees, relating in any way to your use of the contents, or services provided by this web site.


Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.