Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
Public Works

Road construction list

The roadway construction list provides project information in alphabetical order by street name. Project information is available by location in both map and list format.

More information: Lane closures

How to use the construction list

Click on the + beside the project name. A dropdown box will appear with these project details:

  1. type of infrastructure (street, alley, sidewalk, traffic signal, bridge project, pedestrian and cycling path),
  2. type of construction work (reconstruction, rehabilitation, mill & fill, thin bituminous overlay, improvements within the right-of-way)
  3. estimated to start,
  4. estimated to end,
  5. approximate percentage completed:
    • Pre-Construction – Construction phase has not started.
    • 0% – Construction contract is in place, but crews have not mobilized to the site.
    • 5% – Crews have mobilized to the site and construction has just begun.
    • 10% 90% – An approximation of progress; construction is well underway.
    • 95% – Main roadway construction is complete; travelling lanes are open/parking is restored/garbage pickup resumes (depending on the location); minor deficiencies and landscaping (seeding/sod) are likely outstanding.
    • COMPLETE – All construction components of the project are complete. Contractor may return for any follow up or warranty work in the next 1-2 years. Utilities (e.g. street lights) may or may not be complete. Construction may not be complete for other locations in the same contract.
  6. consultant information, and
  7. contractor information.

You can also view projects by street name using the Search box provided. Click "View Map" beside any project name to view in a map.

Note: As construction projects get underway this season the information about start dates and completion dates will be updated to reflect the actual project timeline.

A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z


City of Winnipeg - Public Works Capital Projects
(Last updated on November 26, 2026 @ 10:30 AM)
 
 


Abinojii Mikanah Path   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Stantec Consulting Ltd
Contractor GIP Prairie Ltd.
Abinojii Mikanah WB to Pembina Hw NB   View Map
Facility type Bridge
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Austin St - Higgins Av / Henry Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 15, 2026
Estimated to end Fall 2026
Approx. % completed 70
Consultant WSP Canada Inc
Contractor Darco Enterprises
Document
Austin St_2nd Construction Notice.pdf
Baylor Av and Newcastle Rd Cut-Thru   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Stantec Consulting Ltd
Document
Leeds Ave Construction Notice - 1st Notice - 260408-FINAL.pdf
Bertrand St - Des Meurons St/Youville St   View Map
Facility type Street
Type of work Asphalt Overlay
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Brentford Park   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Stantec Consulting Ltd
Contractor GIP Prairie Ltd.
Document
26-R-9A - Brentford Path Construction Notice - 1st Notice - 260331 - FINAL.pdf
Brunswick St - Burnett Av/McLeod Av   View Map
Facility type Street
Type of work Asphalt Overlay
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Carlaw Av - Nassau St S / Daly St S   View Map
Facility type Street
Type of work Major Rehabilitation
Estimated to start July 20, 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Document
136-2026 Carlaw Avenue 2nd CoW Construction Notice.pdf
Carlton St - Cumberland Av / Notre Dame Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Carlton St - Ellice Av / Cumberland Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Carlton St - Graham Av / St Mary Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Carlton St - Portage Av / Graham Av   View Map
Facility type Street
Type of work Minor Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Carlton St - York Av / Broadway   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Chancellor Dr - Markham Rd / Path   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 8, 2026
Estimated to end Fall 2026
Approx. % completed 70
Consultant Stantec Consulting Ltd
Document
Chancellor Dr Construction Notice - 2nd Notice - Final.pdf
Concordia Ave Multi-Use Pathway   View Map
Facility type Pedestrian / Cycling
Type of work New Construction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 50
Consultant WSP Canada Inc
Contractor Darco Enterprises
Document
Concordia Avenue Multi-Use Pathway 2nd_Construction Notice.pdf
Corydon Av (EB) - Edgeland Bv / Kenaston Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant AECOM Canada Ltd
Corydon Av (EB) - Tuxedo Av / Edgeland Bv   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant AECOM Canada Ltd
Corydon Av (WB) - Handsart Bv / Shaftesbury Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant AECOM Canada Ltd
Corydon Av (WB) - Tuxedo Av / Handsart Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant AECOM Canada Ltd
Dells Cr - Wales Av / Hazelwood Av   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant Stantec Consulting Ltd
Document
26-R-9B - Dells Crescent Construction Notice - 1st Notice - 260331 - FINAL.pdf
Edgewood Park   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 22, 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Stantec Consulting Ltd
Contractor GIP Prairie Ltd.
Document
26-R-9A - Edgewood Path Construction Notice - 2nd Notice.pdf
Edmonton St - Portage Av / Graham Av   View Map
Facility type Street
Type of work Minor Rehabilitation
Estimated to start April 20, 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant WSP Canada Inc
Document
3-2026 Edmonton First Construction Notice.pdf
Edmonton St - Graham Av / St Mary Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start April 20, 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant WSP Canada Inc
Document
3-2026 Edmonton First Construction Notice.pdf
English Pl - Darwin St / Darwin St   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant Stantec Consulting Ltd
Document
26-R-9B - English Place Construction Notice - 1st Notice - 260331- FINAL.pdf
Evans St/Archibald - Prosper St/St Catherine St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start September 2,2026
Estimated to end Fall 2026
Approx. % completed 0
Document
135-2026 Prosper-St Catherine Alley 1st CoW Construction Notice_comb
Greenlea Cv - Gilmore Av / Gilmore Av   View Map
Facility type Street
Type of work Major Rehabilitation
Estimated to start July 27, 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant WSP Canada Inc
Contractor JC Paving
Document
Greenlea_Cv_2nd Construction Notice.pdf
Harbour View Access   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 30
Consultant Dillon Consulting Limited
Harbour View Access   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 30
Consultant Dillon Consulting Limited
Harbour View Access   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 30
Consultant Dillon Consulting Limited
Hargrave St - Cumberland Av / Notre Dame Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Hargrave St - Ellice Av / Cumberland Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Hargrave St - Graham Av / St Mary Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Henderson Hw - Glenway Av/Fortier Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Henry Av - Gunnell St / Sherbrook St   View Map
Facility type Street
Type of work Minor Rehabilitation
Estimated to start June 29, 2026
Estimated to end Fall 2026
Approx. % completed 60
Consultant WSP Canada Inc
Contractor Darco Enterprises
Document
Henry Ave_Construction Notice.pdf
Highfield St/Coniston St - Monck Av/Claremont Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start July 16, 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Dillon Consulting Limited
Document
135-2026 St Mary's-Monck Alley 2nd CoW Construction Notice_comb.pdf
Inman Av/Fermor Av - St Thomas Rd/St Marys Rd   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Jarvis Av - Andrews St / McGregor St   View Map
Facility type Street
Type of work Minor Rehabilitation
Estimated to start September 8, 2026
Estimated to end Fall 2026
Approx. % completed 40
Consultant City Of Winnipeg - Engineering Division
Document
12-2026 2nd CN - Jarvis Stage 2
Jarvis Av - McKenzie St / Parr St   View Map
Facility type Street
Type of work TBO
Estimated to start September 8, 2026
Estimated to end Fall 2026
Approx. % completed 40
Consultant City Of Winnipeg - Engineering Division
Document
12-2026 2nd CN - Jarvis Stage 2
Jarvis Av - McPhillips St/Parr St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start July 6, 2026
Estimated to end Fall 2026
Approx. % completed 40
Consultant City Of Winnipeg - Engineering Division
Document
12-2026 2nd CN - Jarvis Stage 2
Jarvis Av - Powers St / Andrews St   View Map
Facility type Street
Type of work Minor Rehabilitation
Estimated to start September 8, 2026
Estimated to end Fall 2026
Approx. % completed 40
Consultant City Of Winnipeg - Engineering Division
Document
12-2026 2nd CN - Jarvis Stage 2
Kennedy St - Ellice Av / Qu'Appelle Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 25, 2026
Estimated to end Fall 2026
Approx. % completed 50
Consultant WSP Canada Inc
Document
3-2026 Kennedy Second Construction Notice.pdf
Kennedy St - Qu'Appelle Av / Cumberland Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 25, 2026
Estimated to end Fall 2026
Approx. % completed 30
Consultant WSP Canada Inc
Document
3-2026 Kennedy Second Construction Notice.pdf
Kings Dr - Silverstone Av / Kilkenny Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8, 2026
Estimated to end Fall 2026
Approx. % completed 50
Consultant Stantec Consulting Ltd
Document
Kings Dr Construction Notice - 2nd Notice - Final.pdf
Kings Park Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8, 2026
Estimated to end Fall 2026
Approx. % completed 50
Consultant Stantec Consulting Ltd
Document
Kings Dr Construction Notice - 2nd Notice - Final.pdf
La Porte Pl/Le Maire St - La Porte Pl/Le Maire St   View Map
Facility type Alley
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant Stantec Consulting Ltd
Document
Le Maire St Construction Notice - 1st Notice - 260408-FINAL.pdf
Lagimodiere Bv - Almey Av / CNR Overpass   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Lagimodiere Bv - CNR Overpass / Grassie Bv   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Lagimodiere Bv - Concordia Av E / Lagimodiere Bv   View Map
Facility type Street
Type of work Preservation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Lagimodiere Bv - Grassie Bv / CNR Overpass   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Lagimodiere Bv - Lagimodiere Bv / Concordia Av E   View Map
Facility type Street
Type of work Preservation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Lagimodiere Bv - Lagimodiere Bv / Lagimodiere Bv   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Lagimodiere Bv Overpass over CPR Keewatin   View Map
Facility type Bridge
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 40
Additional information Click here
Litz Pl - Henderson Hw / Appleton St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start August 17, 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant WSP Canada Inc
Contractor JC Paving
Document
Litz_Pl_2nd_Construction Notice.pdf
Magdalene By and Loyola By Cut-Thru   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Stantec Consulting Ltd
Document
Killarney Ave Construction Notice - 1st Notice - 260408-FINAL.pdf
Marion St/Horace St - East Limit/Youville St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Marshall Cr - Waller Av / Clarence Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2026
Estimated to end Summer 2026
Approx. % completed 80
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2025 Construction Notice - Marshall Cr.pdf
McDermot Av / Notre Dame Av - Notre Dame Av / Tecumseh St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start August 17, 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant City Of Winnipeg - Engineering Division
Contractor Bituminex Paving Ltd
Document
8-2026 CN - Tecumseh Alley Reconstruction.pdf
McKenzie St - Hartford Av / Jefferson Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 19, 2026
Estimated to end Summer 2026
Approx. % completed 90
Consultant City Of Winnipeg - Engineering Division
Document
4-2026 2nd Construction Notice - McKenzie St Reconstruction_Stage 1.pdf
McKenzie St - Kingsbury Av / Hartford Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 6, 2026
Estimated to end Fall 2026
Approx. % completed 70
Consultant City Of Winnipeg - Engineering Division
Document
4-2026 2nd Construction Notice - McKenzie St Reconstruction_Stage 2.pdf
McMillan Av / Corydon Av - Hugo St N / Cockburn St N   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start August 24, 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Document
136-2026 Corydon-McMillan Alley 1st CoW Construction Notice.pdf
Mount Allison By and Lafayette By Cut-Thru   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant Stantec Consulting Ltd
Document
Bryn Mawr Rd Construction Notice - 1st Notice - 260408-FINAL.pdf
Nassau St S - Brandon Av / Hethrington Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 20, 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Document
136-2026 Nassau Street 2nd CoW Construction Notice.pdf
Nassau St S - Hethrington Av / Morley Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 20, 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Document
136-2026 Nassau Street 2nd CoW Construction Notice.pdf
Osborne St/Nassau St S - Kylemore Av/Walker Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Spring 2026
Estimated to end Summer 2026
Approx. % completed 70
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2025 Construction Notice_Walker_Rathgar.pdf
Osborne St/Nassau St S - Walker Av/Rathgar Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Summer 2026
Approx. % completed 70
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2025 Construction Notice_Walker_Rathgar.pdf
Panet Rd - Nairn Av / CPR TRacks   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 24, 2026
Estimated to end Fall 2026
Approx. % completed 70
Consultant WSP Canada Inc
Document
Panet_2nd Construction Notice.pdf
Paufeld Dr - Karen St / Rothesay St   View Map
Facility type Street
Type of work Major Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 60
Consultant WSP Canada Inc
Contractor Darco Enterprises
Document
Paufeld Dr_Pre-Construction Notice.pdf
Pembina Hw NB to Abinojii Mikanah EB   View Map
Facility type Bridge
Type of work Minor Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Document
Pembina-over-Abinojii-construction-notice-2.pdf
Pembina Hw NB to Abinojii Mikanah WB   View Map
Facility type Bridge
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Document
Pembina-over-Abinojii-construction-notice-2.pdf
Perth Av - McGregor St / Parr St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Plessis Rd - 560 Plessis Rd / St Boniface Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant WSP Canada Inc
Plessis Rd - 996 Plessis Rd / St Boniface Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant WSP Canada Inc
Plessis Rd - St Boniface Rd / 560 Plessis Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant WSP Canada Inc
Plumtree Pl - Meadowood Dr / Meadowood Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant Stantec Consulting Ltd
Document
26-R-9B - Plumtree Place Construction Notice - 1st Notice - 260331- FINAL.pdf
Portage Av - Banting Dr / Sturgeon Rd   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start May 11, 2026
Estimated to end Summer 2026
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Bayview Construction Ltd
Document
Portage Ave - David to Sturgeon 3rd Notice- FINAL - for printing.pdf
Red River College Pathway   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start July 20, 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Contractor Bituminex Paving Ltd
Document
8-2026 CN - RRC Pathway.pdf
Riverwood Av/Oakenwald Av - Point Rd/Lyon St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Rosseau Av W / Ravelston Av W - Brewster St / Plessis Rd   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start September 2,2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant Dillon Consulting Limited
Document
135-2026 Ravelston-Rosseau Alley 1st CoW Construction Notice
Sage North Development Phase 1A Contract 5A   View Map
Facility type Street
Type of work New - Street Construction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Sage North Development Phase 1A Contract 5C   View Map
Facility type Street
Type of work New - Street Construction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Sandralin By - End / Avalon Rd   View Map
Facility type Street
Type of work TBO
Estimated to start September 1, 2026
Estimated to end Fall 2026
Approx. % completed 60
Consultant Stantec Consulting Ltd
Document
26-R-9B - Sandralin Bay Construction Notice - 2nd Notice - Final.pdf
Sherbrook St - Broadway/ Comberland Ave   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start May 19, 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant AECOM Canada Ltd
Document
Let_Construction Notice_05_05_26_60697893 EN - Final.pdf
Silverstone Av Sidewalk (South Side)   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 70
Consultant Stantec Consulting Ltd
Document
Silverstone Ave Construction Notice - 1st Notice - 260408-FINAL.pdf
St Anthony Av - McGregor St / Parr St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 23, 2026
Estimated to end Fall 2026
Approx. % completed 60
Consultant City Of Winnipeg - Engineering Division
Document
4-2026 2nd Construction Noitce - St. Anthony Ave Rehabilitation (Parr to McGregor).pdf
St Mary Av - Edmonton St / Memorial Bv   View Map
Facility type Street
Type of work Reconstruction
Estimated to start April 27, 2026
Estimated to end Fall 2026
Approx. % completed 80
Consultant WSP Canada Inc
Document
3-2026 St. Mary First Construction Notice.pdf
St Marys Rd - Abinojii Mikanah / Dakota St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 11, 2026
Estimated to end Summer 2026
Approx. % completed 90
Consultant Stantec Consulting Ltd
Document
St. Marys 2nd Construction Notice - FINAL - no cc.pdf
St Marys Rd - Fermor Av / Arden Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 11, 2026
Estimated to end Fall 2026
Approx. % completed 90
Consultant Stantec Consulting Ltd
Document
St. Marys 2nd Construction Notice - FINAL - no cc.pdf
St Marys Rd - PTH 100 / Chrypko Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2026
Estimated to end Fall 2026
Approx. % completed 70
Consultant WSP Canada Inc
Document
South St Mary's Preconstruction Notice.pdf
St Marys Rd - St Vital Rd / Fermor Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 11, 2026
Estimated to end Summer 2026
Approx. % completed 90
Consultant Stantec Consulting Ltd
Document
St. Marys 2nd Construction Notice - FINAL - no cc.pdf
Sutherland Av - Charles St/Aikins St   View Map
Facility type Sidewalk
Type of work New Facility - Sidewalk
Estimated to start August 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant City Of Winnipeg - Engineering Division
Document
12-2026 1st CN - Sutherland Ave New Sidewalk.pdf
Tache Av - Messager St/Darveau St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 13,2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
Contractor Darco Enterprises
Document
Tache_2nd_Construction Notice.pdf
University Cr - 80m North of Dysart Rd/Thatcher Dr   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2026
Estimated to end Summer 2026
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Document
Change in Access Notice_Blue Bomber Games FINAL.pdf
University Cr - Markham Rd / 80m North of Dysart Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2026
Estimated to end Summer 2026
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Document
Change in Access Notice_Blue Bomber Games FINAL.pdf
Victory Pl/Sherwood Pl - St Annes Rd/St Marys Rd   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Weatherdon Av - Stafford St / Harrow St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start August 10, 2026
Estimated to end Fall 2026
Approx. % completed 50
Consultant Dillon Consulting Limited
Contractor Bayview Construction Ltd
Document
136-2026 Weatherdon Avenue 1st CoW Construction Notice.pdf
York Av - Carlton St / Kennedy St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
York Av - Kennedy St / Vaughan St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc
York Av - Vaughan St / Memorial Bv   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Summer 2026
Estimated to end Fall 2026
Approx. % completed 0
Consultant WSP Canada Inc

Disclaimer and Indemnity:

The information on this web site is provided as a public service and should be used for general information purposes only. Although the information provided represents the planned capital work on city infrastructure for the current year, the City of Winnipeg cannot guarantee that it is accurate or current at all times. Although it is rare that projects are not finished within the stated timeframe, the City cannot guarantee that the work will be completed in all cases.

The information on this web site is subject to change without notice. Winnipeg.ca AND ITS AFFILIATES ARE NOT RESPONSIBLE IN ANY MANNER FOR DIRECT, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES HOWSOEVER CAUSED RESULTING FROM THE USE, MISUSE OR MISINTERPRETATION OF ANY CONTENT, PRODUCTS OR SERVICES PROVIDED BY THIS WEB SITE.

By using this site, you agree to indemnify, defend and hold harmless City of Winnipeg and its officials, officers, employees and authorized representatives from and against any liability, loss injury (including injuries resulting in death), demand, action, cost, expense, or claim of any kind, including but not limited to lawyer's fees, relating in any way to your use of the contents, or services provided by this web site.


Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.