Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links

Cockburn and Calrossie Sewer Separation Project

Details

The City of Winnipeg is changing the existing combined sewer system in order to alleviate basement flooding and reduce the number of combined sewer overflows in the Fort Garry/Fort Rouge area.

The Cockburn and Calrossie Combined Sewer Relief Works Conceptual Design Report was completed in 2010. The study determined that the current level of service (LOS) for the district's combined sewer is lower than a five-year return period design storm.

Construction of new land drainage sewers (LDS) in the Cockburn and Calrossie combined sewer district will convey wet weather in a new land drainage system, improving the LOS. The proposed sewer separation works will be carried out over a number of years requiring a tentative total of 15 contracts within the Fort Garry/Fort Rouge area. A number of contracts may vary depending on the scope of work.

Construction of combined sewer overflow and basement flood relief works in the Cockburn and Calrossie combined sewer district commenced in November 2013 with Contract 1. To date, ten contracts have been completed with a total committed investment of $83.2 Million. Five more construction contracts are still required to complete the Cockburn and Calrossie sewer separation works. Residents who are directly impacted by current combined sewer separation projects should receive a Water and Waste Notice. Details of the current contracts are as follows:

Contract No. 6b
  • Contract start date: 2021
  • Expected completion date: 2023
  • Estimated cost of contract: $5.3 Million
  • Scope of work:
    • Sewer separation and new land drainage system will be installed at Carter and Weatherdon Avenues between Stafford Street and Pembina Highway, Wentworth Street, Lilac Street and Arbuthnot Street
Contract No. 7
  • Contract start date: 2021
  • Expected completion date: 2023
  • Estimated cost of contract: $6.9 Million
  • Scope of work:
    • Sewer separation and new land drainage system will be installed at Harrow Street, Grant Avenue, Weatherdon Avenue, Carter Avenue, Hector Avenue, Ebby Avenue, Harrow Street East, and Sparling Avenue.

Data values on this page are representative of work completed as of December 31, 2022.

Map

Open house: Construction in Toilers Park

We invite you to an open house to learn more about our construction work and our landscaping plans for the park this spring.

Date:
Tuesday, April 8, 2014

Time:
5:30 – 7:30 pm (drop-in format)

Location:
Lord Roberts Community Centre,
725 Kylemore Avenue

At the open house, we will:

  • provide an update on construction work,
  • share proposed landscaping plans for the park, including options for new park signage, and
  • welcome your feedback.
  • You can view the storyboards online.

Parker Storm Retention Basin Engagement

Thank you to all who attended the Parker Storm Retention Basin information session on Tuesday February 28, 2017.

If you were unable to attend the information session, we encourage you to 
view our presentation boards and provide your comments online in the comments section. The project team can also be contacted at 311 or by email wwdfeedback@winnipeg.ca.

If you would like to stay updated on City of Winnipeg public engagement events, sign up for our newsletter.

Last updated: June 12, 2023

Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.