Cockburn and Calrossie Sewer Separation Project
- Details
- Map
- Documents
- Links
- Engage
Details
The City of Winnipeg is changing the existing combined sewer system in order to alleviate basement flooding and reduce the number of combined sewer overflows in the Fort Garry/Fort Rouge area.
The Cockburn and Calrossie Combined Sewer Relief Works Conceptual Design Report was completed in 2010. The study determined that the current level of service (LOS) for the district's combined sewer is lower than a five-year return period design storm.
Construction of new land drainage sewers (LDS) in the Cockburn and Calrossie combined sewer district will convey wet weather in a new land drainage system, improving the LOS. The proposed sewer separation works will be carried out over a number of years requiring a tentative total of 15 contracts within the Fort Garry/Fort Rouge area. A number of contracts may vary depending on the scope of work.
Construction of combined sewer overflow and basement flood relief works in the Cockburn and Calrossie combined sewer district commenced in November 2013 with Contract 1. To date, ten contracts have been completed with a total committed investment of $83.2 Million. Five more construction contracts are still required to complete the Cockburn and Calrossie sewer separation works. Residents who are directly impacted by current combined sewer separation projects should receive a Water and Waste Notice. Details of the current contracts are as follows:
Contract No. 6b
- Contract start date: 2021
- Expected completion date: 2023
- Estimated cost of contract: $5.3 Million
- Scope of work:
- Sewer separation and new land drainage system will be installed at Carter and Weatherdon Avenues between Stafford Street and Pembina Highway, Wentworth Street, Lilac Street and Arbuthnot Street
Contract No. 7
- Contract start date: 2021
- Expected completion date: 2023
- Estimated cost of contract: $6.9 Million
- Scope of work:
- Sewer separation and new land drainage system will be installed at Harrow Street, Grant Avenue, Weatherdon Avenue, Carter Avenue, Hector Avenue, Ebby Avenue, Harrow Street East, and Sparling Avenue.
Data values on this page are representative of work completed as of December 31, 2022.
Documents
- Parker Information Session Advertisement (February 2017)
- Information Session Post Card (February 2017)
- Information Session Presentation Boards (February 2017)
- Toilers Park Feedback Report (April 2014)
- Follow up to Open House for Toilers Park (May 2014)
- Toilers Park Open House storyboards(April 2014)
- Invitation to Toilers Park Open House(March 2014)
- Letter to residents (December 2013)
- Comments
Related Links
Open house: Construction in Toilers Park
We invite you to an open house to learn more about our construction work and our landscaping plans for the park this spring.
Date:
Tuesday, April 8, 2014
Time:
5:30 – 7:30 pm (drop-in format)
Location:
Lord Roberts Community Centre,
725 Kylemore Avenue
At the open house, we will:
- provide an update on construction work,
- share proposed landscaping plans for the park, including options for new park signage, and
- welcome your feedback.
- You can view the storyboards online.
Parker Storm Retention Basin Engagement
Thank you to all who attended the Parker Storm Retention Basin information session on Tuesday February 28, 2017.
If you were unable to attend the information session, we encourage you to
view our presentation boards and provide your comments online in the comments section. The project team can also be contacted at 311 or by email wwdfeedback@winnipeg.ca.
If you would like to stay updated on City of Winnipeg public engagement events, sign up for our newsletter.