Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
Citizens Information Service
Public Works
Walk Bike Projects

West Alexander to East Exchange Corridor

Continuing the east/west pedestrian and cycling connection to the Exchange and Downtown

This project is now complete.

McDermot Avenue and Bannatyne Avenue provide important east-west connections between Waterfront Drive and Sherbrook Street. This project will improve the existing painted bike lanes by building one-way protected bike lanes, using adjustable bike lane curbs, on McDermot Avenue and Bannatyne Avenue in 2018. View the recommended design under the documents tab. Visit new bike infrastructure – a users guide to review new road features included in the project.


Updates

September 2018

The protected bike lanes along McDermot Avenue and Bannatyne Avenue are now open from Waterfront Drive to Sherbrook Street. The City is continuing to work on additional back-in angled parking on James Avenue, Rupert Avenue, Hargrave Street, and Albert Street. View the Detailed Design drawings.

June 2018

Construction of the West Alexander to East Exchange bike lanes has started and is progressing quickly. Stage 1 construction is expected to be completed by June 22, and work on sections Stages 2 and 3 has also started. The next steps of work on Stage 1 will include adding signs, green paint, pavement markings, and traffic signals. We thank you for your patience as we continue with this work to ensure that the bike lanes are safe for everyone.

May 2018

Construction of the West Alexander to East Exchange bike lanes is expected to start in early June 2018. The project will be completed in three stages:

  • Stage 1 will include construction of the adjustable protected bike lanes on McDermot Avenue and Bannatyne Avenue between Adelaide Street and Main Street, and back-in angled parking on Adelaide Street between William Avenue and McDermot Avenue.
  • Stage 2 will include construction of the adjustable protected bike lanes and back-in angled parking on McDermot Avenue and Bannatyne Avenue between Main Street and Waterfront Drive.
  • Stage 3 will include construction of the adjustable protected bike lanes on McDermot Avenue and Bannatyne Avenue between Furby Street and Adelaide Street, all works on Ellen Street between Bannatyne Avenue and McDermot Avenue, and all works on Hargrave Street between Bannatyne Avenue and McDermot Avenue.

The project is expected to take approximately 12 weeks to complete. For further details please see the May construction notice.

Construction notices related to work in the project area will be posted here prior to construction. If you have questions or want to receive construction notices via email please contact Kevin Rae at AECOM Canada Ltd. 204-928-8430.

March 2018

Throughout late 2017 the project team met with adjacent property owners to help optimize the space. View the recommended design.

What is involved in designing a bike lane

We are working to balance the needs of all users. Within the design, you will notice that in some constrained locations the buffer between the bike lanes and motor vehicle lanes has been reduced or removed to balance the needs of all users.

Within the recommended design, you will also notice some changes to parking. The City understands that parking is important to businesses and residents. With this in mind, we are adding parking within the area to offset the loss of some parking spots along the corridor. View a map of the parking along the corridor and for more information on where parking will be added.

Recommended Design

The Pedestrian and Cycling Strategies identify the West Alexander to East Exchange Corridor as a high priority for upgrading to protected bike lanes. The City has been engaging the public to receive input on what is important to consider when developing a plan. Based on public feedback and technical analysis the recommended design for the West Alexander to East Exchange Corridor is Option 1 (view all three options used for public feedback under the documents tab), which includes one-way protected bike lanes on both McDermot Avenue and Bannatyne Avenue between Waterfront Drive and Furby Street. View the recommended design. Further information on feedback provided by citizens throughout this study is available in the public engagement report available under the documents tab.

Uni-directional protected bike lanes graphic Sample McDermot Avenue (West Alexander)

The project also includes designing a connection to downtown using Ellen/Carlton Street and Hargrave Street. The recommended design includes one-way protected bike lanes on each of Ellen/Carlton Street and Hargrave Street. In 2018, bike lanes will be constructed on Ellen Street and Hargrave between McDermot Avenue and Bannatyne Avenue only. Construction of the remaining parts of this connection will be considered for future construction seasons.

Sample McDermot Avenue (West Alexander)

The three options used during the public engagement process were evaluated based on a number of criteria to understand the benefits and impacts on all road users. The evaluation criteria were developed after engaging with stakeholders to gather information about what is important to those who live, work and spend time in the project area. Public participants identified a number of important considerations including bicycle network connectivity, safety, bicycle comfort, pedestrian comfort, transit reliability and comfort, impacts to motor vehicle traffic, impacts to parking, maintenance and snow removal considerations, and public input. Of these, safety, bicycle network connections, and cycling comfort were identified as most important.

All options have considerations for impacts on motor vehicle traffic, transit, and parking. This option was preferred for the following reasons:

  • Ranked highest based on public input in terms of safety, network connections, and cycling comfort.
  • Ranked highest based on technical analysis in terms of bicycle network connections, safety and comfort.

Engage

Given the length of these streets and the magnitude of costs for permanent implementation, the protected bike lanes will be built using adjustable bike lane curbs. This adjustable infrastructure will allow for on-going monitoring and public feedback of protected bike lanes that will inform the design of the permanent infrastructure to be constructed at the time of the future street renewal.

If you would like to provide feedback on the use of adjustable curbs in Winnipeg, please contact adjustablebikelanes@winnipeg.ca or 311.

The project team sought public input through a variety of online and in-person activities in 2017. Phase 1 gathered information about key project values and objectives, current uses, and safety. This information was used to support functional design options developed in Phase 2.

Phase 2 – Results

An online survey was available from June 8 – 30, 2017 with a total 243 completed submissions.

Thank you to all who came out during Bike Week pop-up events on Tuesday, June 20 and Wednesday, June 21. Events were held at:

  • Hugh John MacDonald School, 567 Bannatyne Ave.
  • Old Market Square, Exchange District

Over 500 people tried out the pop-up protected bike lanes or discussed improvements with the project team.

infographic 1 infographic 2
infographic 3  
Phase 1- Results

An online survey and mapping tool were available from February 1 to 21 with a total of 316 completed submissions.

Thank you to all who came out to the Bike to Work Day pop-up events on Friday, February 10. Events were held at:

  • 10 a.m. to noon at Bronuts, C-100 King St.;
  • 1 p.m. to 2 p.m. at Red River College, Loewen Atrium, 160 Princess St.;
  • 1 p.m. to 2 p.m. at Across the Board Cafe, 211 Bannatyne Ave.; and,
  • 3:30 p.m. to 5:30 p.m. at Boon Burger Cafe, 141 Bannatyne Ave.

We had over 440 interactions to discuss the improvements to bike lanes on McDermot Avenue and Bannatyne Avenue and gather information about what is important to those who live, work, and spend time in the project area.

infographic 1 infographic 2
infographic 3 infographic 4

For further information or to provide your feedback you may contact:
John Osler, Public Engagement Lead
204-942-0654
WestAlexCorr@intergroup.ca

If you would like to stay updated on City of Winnipeg public engagement events, follow the City on Facebook and Twitter or sign up for our newsletter.

Project Timeline

Timeline

Timeline

Background

  • In November 2011, City of Winnipeg Council approved the Transportation Master Plan (TMP). A key goal of the TMP is to expand the range of travel options that are available to residents, workers, and visitors, as well as to ensure that people are not dependent on one single mode of transportation. The TMP also calls for the development of the Pedestrian and Cycling Strategies.
  • In 2015, City Council approved the Winnipeg Pedestrian and Cycling Strategies, which provides a long-range policy framework for active modes of transportation for the next 20 years.
  • In September 2015, the City of Winnipeg initiated a public engagement process to receive input on the Downtown Bike Lane System and the West Alexander Pedestrian and Cycling Corridor. Feedback received during this process has been incorporated into preferred design options, which include a two-way protected bike lane on Garry Street through the Downtown Bike Lane System and Street Improvements project and a two-way protected bike lane on McDermot Avenue between Arlington Street and Furby Street through the West Alexander Pedestrian and Cycling Corridor project. These projects are being built over the next couple of years. For more information on these projects please see the Downtown Bike Lane System and Street Improvements web page and the West Alexander Pedestrian and Cycling Corridor web page.
  • In January 2017, a public engagement process was initiated to receive input on the West Alexander to East Exchange corridor to continue the east-west pedestrian and cycling connection to the Exchange and Downtown. This project is a high priority in the Pedestrian and Cycling Strategies and will improve travel choices and connectivity to the Exchange District, Downtown, Health Sciences Centre, University of Manitoba Bannatyne Campus, and neighbourhoods surrounding Sherbrook Street. View the recommended design.
  • Given the length of these streets and the magnitude of costs for permanent implementation the protected bike lanes will be built using adjustable bike lane curbs. This adjustable infrastructure will allow for on-going monitoring and public feedback of protected bike lanes that will inform the design of the permanent infrastructure to be constructed at the time of the future street renewal. If you would like to provide feedback on the use of adjustable curbs in Winnipeg, please contact adjustablebikelanes@winnipeg.ca or 311.

Documents

Document Name Date Type
Phase 1 - Popup Invite 2017-02-01 Community Letter
Phase 1 - Postcard Invite 2017-02-01 Community Letter
Phase 1 - News Release 2017-02-01 News Release
Phase 2 - Invite 2017-06-08 Community Letter
Phase 2 - Poster 2017-06-08 Community Letter
Phase 2 - Workshop Presentation 2017-06-08 Presentation
Phase 2 – Pop-up Materials 2017-06-08 Pop-up Materials
Phase 1- Public Engagement Report 2017-06-08 Report
Phase 2 – News Release 2017-06-09 News Release
Phase 2 - Public Engagement Report 2017-09-13 Report
Construction Notice 2018-05-28 Community Letter
Recommended Design 2018-09-17 Graphic
Parking in the Exchange 2018-09-17 Graphic
Project Update: West Alexander to East Exchange Corridor 2018-08-15 Community Letter

Frequently Asked Questions

Open all | Close all

Are the bike lanes meant to be wide enough for two cyclists?
The bike lanes are one-way and allow for one lane of cyclists to move along the corridor. The curb-to-curb widths of McDermot Avenue and Bannatyne Avenue differ throughout the corridor. In order to provide consistent vehicle lane widths and alignment, the widths of the protected bike lane and buffer must change from block to block to make up this difference. This allows room for cyclists to pass in some sections, as well providing space for storing snow in the winter.
Why is there a gap in the protected bike lane on McDermot Avenue, between Main Street and Albert Street?
This has been done to accommodate the bus stop. Given the width of the road, a floating bus stop, which would have allowed for the bike lane to be continually protected, could not be built at that location.
Why are there no protected bike lanes on McDermot Avenue and Bannatyne Avenue between Rorie Street and Waterfront Drive?
There are many considerations that needed to be balanced when designing bike lanes on McDermot Avenue and Bannatyne Avenue. Through stakeholder engagement we heard that on-street parking was very important to be maintained in the area. To accommodate the addition of back-in angled parking on these blocks there was not enough space to install protected bike lanes.
Why are there gaps in parking on Bannatyne Avenue between Furby Street and Isabel Street?
These gaps have been left intentionally to ensure that Fire Paramedic Service has access all along the street.
Why is there no protected bike lane on Bannatyne Avenue between Adelaide Street and Princess Street?
To accommodate the truck loading on this block we were not able to install protected bike lanes.
Why do only some sections of Bannatyne Avenue, between Rorie Street and Main Street, have protected bike lanes?
The sections of the street without protected bike lanes are to accommodate the summer patio and bus stop. During the summer the bike lane will be protected next to the patio with planters.
Why do the widths of the protected bike lane and buffer change along the corridors?
The curb-to-curb widths of McDermot Avenue and Bannatyne Avenue differ throughout the corridor. In order to provide consistent vehicle lane widths and alignment, the widths of the protected bike lane and buffer must change from block to block to make up this difference, with minimum widths of 2.0m and 0.3m respectively.
Why was McDermot Avenue/Bannatyne Avenue considered?
The City's Pedestrian and Cycling Strategies have prioritized McDermot Avenue/Bannatyne Avenue as an important connection into the downtown Winnipeg area. This study was approved by Council and is part of the 2016 Pedestrian and Cycling Action Plan.
How will this project maintain and enhance safety?
Separating all road users presents the safest way to accommodate all modes of transportation. Enhanced street crossings will be considered along with creating space for streetscape improvements including bike parking, lighting, trees, and street furniture. The City is committed to creating a pedestrian and cycling network that is safe and accessible for people of all ages and abilities.
Will there be a loss of on-street parking and loading zone space as a result of new cycling infrastructure?
The design will maintain as much on-street parking and loading as possible. The City understands that parking is important to businesses and residents. With this in mind, we are adding parking within the area in order to offset the loss of some parking spots along the corridor. One option that is currently being explored is to add additional back-in, angled parking spots on nearby streets. This would build off of the back-in, angled parking currently taking place on Bannatyne Avenue near Waterfront Drive (by adding back-in, angled parking on a small section of Bannatyne Avenue, the parking capacity was increased by 10 spots). View a map of parking along the corridor and for more information on where we will be adding parking opportunities.
Is angled parking in the Exchange being considered to help increase parking opportunities?
As part of the study we will be considering multiple options to determine how parking can be maximized.
Will vehicular access to private property and businesses be limited by new pedestrian and cycling infrastructure?
Private access would not be closed as a result of this project unless requested by the landowner. In the event vehicles are required to cross a protected cycling lane, signage and surface treatments would promote awareness for both cyclists and vehicles.
Winter lasts about half of the year, so why are we building bike lanes?
The City’s Pedestrian and Cycling Strategies commits to providing and maintaining safe walking and cycling infrastructure year-round.
Will new cycling lanes connect with existing cycling routes and destinations?
Upgraded cycling routes on McDermot Avenue and Bannatyne Avenue will ensure enhanced connections to existing and future planned infrastructure such as the West Alexander pedestrian and cycling corridor, the Arlington Street/Bridge connection, Downtown Bike Lane System, as well as future studies.
When will permanent facilities on McDermot Avenue/Bannatyne Avenue be constructed?
Given the length of these streets and the anticipated magnitude of costs for permanent implementation, it is anticipated that bike infrastructure upgrades would have to be implemented in conjunction with street renewal programs over the course of several construction seasons. Currently there is no such funding in place.

The project is looking at adjustable bike lanes as a solution that can be implemented in the shorter-term.
What are adjustable protected bike lanes?
Adjustable protected bike lanes are bike lanes that are physically separated from lanes of traffic and pedestrian infrastructure using a variety of options. The layout and installation can be easily modified based on actual performance and on-going public engagement. The implementation can be done reasonably quickly and is cost-effective.
How will the bike lanes be maintained during the winter months?
Bike lanes will be winter maintained based on the current Council approved Snow Policy.
Are there plans to remove the adjustable curbs during the winter?
The curbs are permanent, but their specific location is adjustable to optimize the site. They will not be removed during the winter.
How will on-going monitoring and public feedback inform or change the bike lane design?
The City continues to collect public feedback on adjustable curbs through email submission to adjustablebikelanes@winnipeg.ca or through citizen contact with 311. The transportation division will monitor the new infrastructure on a continual basis through quarterly inspections as the seasons change. The use of both public feedback and technical analysis will be used to inform the design of the permanent infrastructure to be constructed at the time of the future street renewal.
What are the City of Winnipeg's Pedestrian and Cycling Strategies?
On July 15, 2015, the City of Winnipeg Council adopted the Winnipeg Pedestrian and Cycling Strategies. This document stems from the 2011 Transportation Master Plan. The Strategies provide a long-range policy framework for active modes of transportation in Winnipeg for the next 20 years. Following public engagement in 2013 with more than 3,000 Winnipeggers, the Strategies will assist in the prioritization of walking and cycling infrastructure projects city-wide based on further in-depth engagement with neighbourhood and local stakeholders on a per project basis.
How can I stay involved in the project?
The City continues to collect public feedback on adjustable curbs through email submission to adjustablebikelanes@winnipeg.ca or through citizen contact with 311. Join our email list to be notified about upcoming engagement activities, look at the "Engage" tab on this website, and follow the City of Winnipeg on Facebook and Twitter .

Maps

Area map

Area map

Area map

Parking in the Exchange

parking in the Exchange

Parking in the Exchange

Last update: January 8, 2020

Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.